GTR 9-Phase 2 Informal Group (GTR9) reports to GRSP
Documents
6 Feb 2013 Final report (corrected) of the 4th GTR 9-Phase 2 informal group session GTR9-04-02/Rev.2 2013-02-06 Corrected version of the revised minutes.
9 Jan 2013 GTR 9-Phase 2 informal group action list: Revision 1 GTR9-04-03/Rev.1 2013-01-09 Revised list pursuant to session 5.
9 Jan 2013 Draft minutes of the 5th GTR 9-Phase 2 informal group session GTR9-05-02 2013-01-09
19 Mar 2013 Final minutes of the 5th GTR 9-Phase 2 informal group session GTR9-05-02/Rev.1 2013-03-19
9 Jan 2013 Initial OICA comments on document GTR9-05-20 (OICA) GTR9-05-23/Corr.1 2013-01-09 Initial comments of OICA representatives to the 5th IG GTR9-PH2 meeting in response to document GTR9-5-20: corrected version. OICA
11 Jan 2013 FlexPLI version GTR drawing package (zip compressed file) (Humanetics) GTR9-05-31 2013-01-11 Humanetics
25 Jun 2013 FlexPLI version GTR drawing package: revision (zip compressed file) (Humanetics) GTR9-05-31/Rev.1 2013-06-25 Humanetics
12 Mar 2013 Draft agenda for the 6th GTR 9-Phase 2 informal group session GTR9-06-01 2013-03-12
19 Mar 2013 Revised draft agenda for the 6th GTR9-Phase 2 informal group session GTR9-06-01/Rev.1 2013-03-19
3 Jun 2013 Draft minutes of the 6th GTR 9-Phase 2 informal group session GTR9-06-02 2013-06-03
5 Jul 2013 Revised draft minutes of the 6th GTR 9-Phase 2 informal group session GTR9-06-02/Rev.1 2013-07-05 Second draft of the meeting minutes.
10 Sep 2013 Final minutes of the 6th GTR 9-Phase 2 informal group session GTR9-06-02/Rev.2 2013-09-10
12 Mar 2013 FlexPLI Testing: Propelling Accuracy (OICA) GTR9-06-03 2013-03-12 OICA
12 Mar 2013 Mutual Resolution 1 guidelines for test tools GTR9-06-04 2013-03-12 Guidelines for the development of drawings for a test tool to be added as an Addendum to UN Mutual Resolution No. 1 (M.R.1)
12 Mar 2013 Schedule for preparing an addendum to MR 1 for FlexPLI test tool GTR9-06-05 2013-03-12
12 Mar 2013 FlexPLI GTR User Manual Rev. E 2013 (Humanetics) GTR9-06-06 2013-03-12 Humanetics
12 Mar 2013 Proposal for a Definition of the FlexPLI Biofidelic Assessment Interval (BAI) (BASt) GTR9-06-07 2013-03-12 BASt
12 Mar 2013 Derivation of Draft FlexPLI prototype impactor limits (BASt) GTR9-06-08 2013-03-12 BASt
21 Mar 2013 Derivation of Draft FlexPLI prototype impactor limits (revised) (BASt) GTR9-06-08/Rev.1 2013-03-21 BASt
12 Mar 2013 Review of FlexPLI drawing package and consistency check against hardware (BASt) GTR9-06-09 2013-03-12 BASt
12 Mar 2013 FlexPLI Pre- and Post-Test Procedure (BASt) GTR9-06-10 2013-03-12 BASt
14 Mar 2013 Consideration of the rebound phase in GTR 9 FlexPLI test procedure (JASIC) GTR9-06-11 2013-03-14 JASIC
14 Mar 2013 Validation of Pedestrian Safety Flex-GTR model (JASIC) GTR9-06-12 2013-03-14 JASIC
14 Mar 2013 Proposal for an amendment to GTR 9 to define "primary peference marks" (OICA) GTR9-06-13 2013-03-14 Proposal for wording to consider tolerances of the normal ride height. OICA
14 Mar 2013 Pedestrian safety FlexPLI round robin testing (NHTSA) GTR9-06-14 2013-03-14 NHTSA
14 Mar 2013 JP Research review of JASIC & BASt Flex-PLI Injury Reduction Estimate (Alliance and JP Research) GTR9-06-15 2013-03-14 Alliance JP Research
17 Mar 2013 JP Research review of JASIC & BASt Flex-PLI Injury Reduction Estimate: Revised (JP Research and Alliance) GTR9-06-15/Rev.1 2013-03-17 JP Research Alliance
14 Mar 2013 JP Research summary of its review of FlexPLI injury reduction estimates (JP Research) GTR9-06-16 2013-03-14 Letter of transmittal for the JP Research review of JASIC and BASt Flex-PLI injury-reduction estimates. JP Research
17 Mar 2013 Pedestrian Protection: Large Truck/SUV Challenges (Alliance) GTR9-06-17 2013-03-17 Alliance
17 Mar 2013 Ford GTR09 US Vehicle Round Robin (Ford) GTR9-06-18 2013-03-17 Ford Motor Co. evaluation of the FlexPLI impactor and test procedures. Ford
17 Mar 2013 Shape Corp.: GTR09 NA vs EU Vehicle Modified Round Robin (Shape) GTR9-06-19 2013-03-17 Results from Shape Corp. evaluation of FlexPLI impactor and pedestrian protection test procedure. Shape
20 Mar 2013 Shape Corp.: GTR09 NA vs EU Vehicle Modified Round Robin: Revision 1 (Shape) GTR9-06-19/Rev.1 2013-03-20 Shape
16 Mar 2013 Discussion on Impactor Thresholds (OICA) GTR9-06-20 2013-03-16 OICA response opposing the BASt proposal (document GTR9-5-20) to change the impactor thresholds for FlexPLI testing. OICA
17 Mar 2013 Proposal on FlexPLI measuring results and Flex-PLI requirements of GTR9-PH2 (OICA) GTR9-06-21 2013-03-17 OICA updated proposal concerning FlexPLI test results and the measurement criteria appropriate for GTR 9-Phase 2 test procedures. OICA
17 Mar 2013 FlexPLI Drawing Review (surface level) Update (JASIC) GTR9-06-22 2013-03-17 JASIC
17 Mar 2013 FlexPLI Drawing Review (Cellbond) GTR9-06-23 2013-03-17 Technical questions concerning the design and materials composition of the FlexPLI impactor following review of current drawing package. Cellbond
21 Mar 2013 FlexPLI Drawing Review (revised) (Cellbond) GTR9-06-23/Rev.1 2013-03-21 Cellbond
25 Jun 2013 Flex PLI drawing review (Cellbond) GTR9-06-23/Rev.2 2013-06-25 Cellbond
19 Mar 2013 Durability Study FlexPLI SN03 at Bertrandt Laboratory (Bertrandt) GTR9-06-24 2013-03-19 Bertrandt
21 Mar 2013 Comments on document GTR9-06-15 (BASt) GTR9-06-25 2013-03-21 German reply to US OEM comments (JP Research review of JASIC & BASt Flex-PLI Injury Reduction Estimate) on the FlexPLI cost-benefit analysis. BASt
21 Mar 2013 Injury Probability Functions for the Flexible Pedestrian Legform Impactor (SAE and JASIC) GTR9-06-26 2013-03-21 Presentation on injury thresholds by researchers from Toyota, Honda, and Nissan. SAE JASIC
21 Mar 2013 JASIC Comments on Alliance and JP Research Documents (JASIC) GTR9-06-27 2013-03-21 Japanese responses to the US OEM comments on the FlexPLI cost-benefit analysis. JASIC
25 Apr 2013 Certification test results of the OEM legform used in document GTR9-6-20 (OICA) GTR9-06-28 2013-04-25 OICA
18 Jun 2013 Draft agenda for the 7th GTR 9-Phase II informal group session GTR9-07-01 2013-06-18
18 Jul 2013 Final agenda for the 7th GTR 9-Phase II informal group session GTR9-07-01/Rev.1 2013-07-18
24 Jul 2013 Draft minutes of the 7th GTR 9-Phase II informal group session GTR9-07-02 2013-07-24
10 Sep 2013 Final minutes of the 7th GTR 9-Phase 2 informal group session GTR9-07-02/Rev.1 2013-09-10
25 Jun 2013 Draft running order of the provisional agenda for the 7th GTR 9-Phase 2 informal group session GTR9-07-03 2013-06-25
25 Jun 2013 Information on GTR 9-related drawing packages GTR9-07-04 2013-06-25 Summary of pedestrian safety drawing packages as provided by Humanetics.
2 Jul 2013 FlexPLI: Result of drawing review (surface level) (JASIC) GTR9-07-05/Corr.1 2013-07-02 Revised version of the document. JASIC
2 Jul 2013 Result of the FlexPLI manual review (JASIC) GTR9-07-06/Corr.1 2013-07-02 Revised version of the earlier document. JASIC
2 Jul 2013 FlexPLI: Injury probability function for tibia fracture and MCL failure (JASIC) GTR9-07-07 2013-07-02 JASIC
2 Jul 2013 Flex-GTR Master Leg Development and Evaluation (JASIC) GTR9-07-08 2013-07-02 Development of the Flex-GTR Master Leg FE Model and Evaluation of the Validity of the Current Threshold Values against the Flex-GTR Master Leg JASIC
2 Jul 2013 Flex-GTR Master Leg Level Impactor Test Data: Pendulum Test (JASIC) GTR9-07-09 2013-07-02 JASIC
2 Jul 2013 Flex PLI Logbook for the IG GTR9-PH2 Round Robin Tests (BGS) GTR9-07-10 2013-07-02 BGS
2 Jul 2013 Flex PLI Logbook for the IG GTR9-PH2 Round Robin Tests (BGS) GTR9-07-11 2013-07-02 BGS
2 Jul 2013 Flex PLI Logbook for the IG GTR9-PH2 Round Robin Tests (BGS) GTR9-07-12 2013-07-02 BGS
2 Jul 2013 FlexPLI Rebound Phase (JASIC) GTR9-07-13 2013-07-02 A comparison of tibia bending moment time histories has shown that the exaggerated secondary peak of the FlexPLI model relative to the human model may affect the maximum value for some specific vehicles. JASIC
5 Jul 2013 Flex PLI: Detailed Review of Drawing Package and Itemized Check against Master Leg Impactor SN03 (BASt and BGS) GTR9-07-14 2013-07-05 BASt BGS
5 Jul 2013 BASt comments on document GTR9-07-13: JASIC position on FlexPLI rebound phase (BASt) GTR9-07-15 2013-07-05 BASt
5 Jul 2013 Collation of FlexPLI Pendulum Certification Test Results (BASt) GTR9-07-16 2013-07-05 BASt
24 Jul 2013 Collation of FlexPLI Pendulum Certification Test Results (revised) (BASt) GTR9-07-16/Rev.1 2013-07-24 BASt
5 Jul 2013 Collation of FlexPLI Inverse Certification Test Results (BASt) GTR9-07-17 2013-07-05 BASt
24 Jul 2013 Collation of FlexPLI Inverse Certification Test Results (revised) (BASt) GTR9-07-17/Rev.1 2013-07-24 BASt
6 Sep 2013 Draft agenda for the 8th GTR 9-Phase 2 informal group session GTR9-08-01 2013-09-06
10 Sep 2013 Final agenda for the 8th GTR 9-Phase 2 informal group session GTR9-08-01/Rev.1 2013-09-10
23 Nov 2013 Draft minutes of the 8th GTR 9-Phase II informal group session GTR9-08-02 2013-11-23
16 Dec 2013 Final minutes of the 8th session of the GTR9-Phase 2 informal group GTR9-08-02/Rev.1 2013-12-16
6 Sep 2013 GTR9 – Draft Working Document of IG GTR9 PH2 (Version 1: 04 Sept. 2013) GTR9-08-03 2013-09-06
12 Sep 2013 GTR9 – Draft Working Document of IG GTR9 PH2 (Version 2: 10 Sept. 2013) GTR9-08-03/Rev.1 2013-09-12
6 Sep 2013 GTR9 – Draft Preamble of IG GTR9 PH2 (Version 1: 04 Sept. 2013) GTR9-08-04 2013-09-06
6 Sep 2013 GTR No. 9 – Draft proposal for Amendment 2 GTR9-08-06 2013-09-06
6 Sep 2013 Proposed title block for GTR 9 regulation drawings (Humanetics) GTR9-08-07 2013-09-06 Humanetics
6 Sep 2013 Comments to JAMA presentation GTR9-7-06c and Proposed Changes, Flex PLI GTR Manual (Humanetics) GTR9-08-08 2013-09-06 Humanetics
6 Sep 2013 Humanetics Comments to Cellbond Flex PLI Drawing Check Document (Humanetics) GTR9-08-09 2013-09-06 Comments on document GTR9-06-23 Humanetics
6 Sep 2013 Humanetics comments to JASIC Flex drawing review (Humanetics) GTR9-08-10 2013-09-06 Comments on document GTR-07-05/Corr.1 Humanetics
6 Sep 2013 Comparison of Effect of Different Approaches on Injury Risk Functions (JASIC) GTR9-08-11 2013-09-06 JASIC
10 Sep 2013 Possible Influence of Temperature & Humidity on the FlexPLI Behaviour (OICA) GTR9-08-12 2013-09-10 OICA
9 Sep 2013 FlexPLI Manual: FlexPLI Preparation before Car Testing (OICA) GTR9-08-13 2013-09-09 OICA review and proposals for improvement of the FlexPLI leg form test tool manual. OICA
10 Sep 2013 Request for Transitional Provisions for FlexPLI Usage (OICA) GTR9-08-14 2013-09-10 OICA
10 Sep 2013 FlexPLI Biofidelic Assesment Interval (BAI): Open Issues (BASt) GTR9-08-15 2013-09-10 BASt
10 Sep 2013 Change to foam flesh used by EEVC lower & upper legforms (TRL) GTR9-08-16 2013-09-10 TRL
10 Sep 2013 FlexPLI Version GTR Testing of Vehicles with Different Bumper Systems (OICA) GTR9-08-17 2013-09-10 OICA
10 Sep 2013 Femur Certification Corridors for the Inverse Test (Zero Cross Timing) (JASIC) GTR9-08-18 2013-09-10 JASIC
10 Sep 2013 Femur Certification Corridors for the Pendulum Test (Zero Cross Timing) (JASIC) GTR9-08-19 2013-09-10 JASIC
7 Dec 2013 Draft agenda for the 9th GTR 9-Phase 2 informal group session GTR9-09-01 2013-12-07
16 Dec 2013 Final agenda for the 9th GTR 9-Phase 2 informal group session GTR9-09-01/Rev.1 2013-12-16
7 Dec 2013 FlexPLI weight tolerances: Reduction of proposed weight tolerances (OICA) GTR9-09-03 2013-12-07 OICA
16 Dec 2013 Lower Legform Test Area: Justification of the Need for a Relaxation Zone (Revised) (OICA) GTR9-09-04/Rev.1 2013-12-16 OICA
7 Dec 2013 Proposal of 01 series of amendments to Regulation No. 127 (Japan) GTR9-09-05 2013-12-07 Suggested changes to the proposal made by the GTR 9-Phase 2 informal group to the GRSP for amendments to the UN Regulation on pedestrian protection of motor vehicles (document GRSP/2013/26). Japan
7 Dec 2013 Proposed amendments of the three-point bending certification test figure in GTR No. 9 (Japan) GTR9-09-06 2013-12-07 Japan
12 Dec 2013 FlexPLI GTR User Manual Rev. F (Draft) 2013 (Humanetics) GTR9-09-07 2013-12-12 Humanetics
16 Dec 2013 Flex PLI GTR: User Manual (Humanetics) GTR9-09-07/Rev.1 2013-12-16 Humanetics
12 Dec 2013 Updates to Flex PLI Manual Rev E to Rev F (Humanetics) GTR9-09-08 2013-12-12 Humanetics
16 Dec 2013 Updates to Flex PLI Manual Rev E to Rev F (Humanetics) GTR9-09-08/Rev.1 2013-12-16 Humanetics
12 Dec 2013 Flex PLI: Max and Min Femur Certification Analysis (Humanetics) GTR9-09-09 2013-12-12 Humanetics
12 Dec 2013 Flex PLI Review: Weight Tolerance (Humanetics) GTR9-09-10 2013-12-12 Humanetics
12 Dec 2013 Details of Drawing Updates to Flex GTR9 Regulation Drawings (Humanetics) GTR9-09-12 2013-12-12 Humanetics
12 Dec 2013 Flex PLI: Flesh Neoprene Corridor (Humanetics) GTR9-09-13 2013-12-12 Humanetics
12 Dec 2013 Flex PLI Review: Dimensional Tolerance (Humanetics) GTR9-09-14 2013-12-12 Humanetics
16 Dec 2013 Change to foam flesh used by EEVC lower & upper legforms (TRL) GTR9-09-15 2013-12-16 Update on changes to the CONFOR foam flesh used in the EEVC lower and upper legform impactors. TRL
16 Dec 2013 Flex PLI Drawing Review (Cellbond) GTR9-09-16 2013-12-16 Cellbond