Mr. Burleigh introduced the updated manual – revision E of early 2013 – of the FlexPLI (document GTR9-6-06). He highlighted several changes that were made compared to the earlier version of the manual. Mr. Burleigh stated that he would welcome comments and he will consider them accordingly. The chair proposed to allow the attendees some time to check the manual and to then prepare a next version. Mr. Gay was wondering whether all the drawings mentioned in the manual will be available since Cellbond is missing some of them in the drawing package. Mr. Burleigh promised to double-check this and to make missing information available.
After some discussion it was then finally agreed that Mr. Burleigh (or Humanetics respectively) will deliver a further update of the manual in due time before the FlexPLI planned amendment in Geneva (action item A-6-04).
The chair explained the objective to have a draft addendum for the M.R.1 ready for the 7th meeting of this group.