GTR No. 9
← GTR No. 8
GTR No. 10 →
Texts and Appendices Documents Meetings
← Back
Documents 2013 147 documents
6 Sep 2013 Comparison of Effect of Different Approaches on Injury Risk Functions (JASIC) GTR9-08-11
6 Sep 2013 Draft agenda for the 8th GTR 9-Phase 2 informal group session GTR9-08-01
6 Sep 2013 GTR9 – Draft Working Document of IG GTR9 PH2 (Version 1: 04 Sept. 2013) GTR9-08-03
6 Sep 2013 GTR9 – Draft Preamble of IG GTR9 PH2 (Version 1: 04 Sept. 2013) GTR9-08-04
6 Sep 2013 GTR No. 9 – Draft proposal for Amendment 2 GTR9-08-06
6 Sep 2013 Proposed title block for GTR 9 regulation drawings (Humanetics) GTR9-08-07
6 Sep 2013 Comments to JAMA presentation GTR9-7-06c and Proposed Changes, Flex PLI GTR Manual (Humanetics) GTR9-08-08
6 Sep 2013 Humanetics Comments to Cellbond Flex PLI Drawing Check Document (Humanetics) GTR9-08-09
6 Sep 2013 Humanetics comments to JASIC Flex drawing review (Humanetics) GTR9-08-10
27 Aug 2013 Fourth progress report for Phase 2 of GTR No. 9 WP.29/2013/129
24 Jul 2013 Collation of FlexPLI Inverse Certification Test Results (revised) (BASt) GTR9-07-17/Rev.1
24 Jul 2013 Collation of FlexPLI Pendulum Certification Test Results (revised) (BASt) GTR9-07-16/Rev.1
24 Jul 2013 Draft minutes of the 7th GTR 9-Phase II informal group session GTR9-07-02
18 Jul 2013 Final agenda for the 7th GTR 9-Phase II informal group session GTR9-07-01/Rev.1
5 Jul 2013 Revised draft minutes of the 6th GTR 9-Phase 2 informal group session GTR9-06-02/Rev.1
5 Jul 2013 Collation of FlexPLI Inverse Certification Test Results (BASt) GTR9-07-17
5 Jul 2013 Collation of FlexPLI Pendulum Certification Test Results (BASt) GTR9-07-16
5 Jul 2013 BASt comments on document GTR9-07-13: JASIC position on FlexPLI rebound phase (BASt) GTR9-07-15
5 Jul 2013 Flex PLI: Detailed Review of Drawing Package and Itemized Check against Master Leg Impactor SN03 (BASt, BGS) GTR9-07-14
2 Jul 2013 Result of the FlexPLI manual review (JASIC) GTR9-07-06/Corr.1
2 Jul 2013 FlexPLI: Result of drawing review (surface level) (JASIC) GTR9-07-05/Corr.1
2 Jul 2013 FlexPLI Rebound Phase (JASIC) GTR9-07-13
2 Jul 2013 FlexPLI: Injury probability function for tibia fracture and MCL failure (JASIC) GTR9-07-07
2 Jul 2013 Flex-GTR Master Leg Development and Evaluation (JASIC) GTR9-07-08
2 Jul 2013 Flex PLI Logbook for the IG GTR9-PH2 Round Robin Tests (BGS) GTR9-07-10
2 Jul 2013 Flex-GTR Master Leg Level Impactor Test Data: Pendulum Test (JASIC) GTR9-07-09
2 Jul 2013 Flex PLI Logbook for the IG GTR9-PH2 Round Robin Tests (BGS) GTR9-07-11
2 Jul 2013 Flex PLI Logbook for the IG GTR9-PH2 Round Robin Tests (BGS) GTR9-07-12
26 Jun 2013 Fourth progress report of the informal group on Phase 2 of GTR No. 9 WP.29-160-37
25 Jun 2013 FlexPLI version GTR drawing package: revision (zip compressed file) (Humanetics) GTR9-05-31/Rev.1
25 Jun 2013 Flex PLI drawing review (Cellbond) GTR9-06-23/Rev.2
25 Jun 2013 Draft running order of the provisional agenda for the 7th GTR 9-Phase 2 informal group session GTR9-07-03
25 Jun 2013 Information on GTR 9-related drawing packages GTR9-07-04
18 Jun 2013 Draft agenda for the 7th GTR 9-Phase II informal group session GTR9-07-01
3 Jun 2013 Draft minutes of the 6th GTR 9-Phase 2 informal group session GTR9-06-02
30 May 2013 FlexPLI behaviour in outer area: Expanded version (OICA) TF-BTA-03-03/Rev.1
30 May 2013 Task Force-Bumper Test Area: EC Study Update: revised (TRL) TF-BTA-03-06/Rev.1
30 May 2013 Final minutes of the 2nd TF-BTA meeting TF-BTA-02-02/Rev.1
29 May 2013 Draft minutes of the 3rd TF-BTA meeting TF-BTA-03-02
27 May 2013 Fourth progress report of the informal group on Phase 2 of GTR No. 9 WP.29-160-13
18 May 2013 GTR No. 9 – Draft proposal for Amendment 2 GRSP-53-29
17 May 2013 Audi A3 and VW Golf 7: Legform testing and width of bumper test areas (OICA) TF-BTA-03-10
17 May 2013 FlexPLI and EEVC legform behavior outside the regulatory BTA (Renault, ACEA, OICA) TF-BTA-03-08
17 May 2013 Pedestrian Protection: Assessment with lower legform at BTA limits and beyond (OICA) TF-BTA-03-07
17 May 2013 Draft fourth progress report of the informal group on Phase 2 of GTR No. 9 GRSP-53-28
15 May 2013 J-NCAP Test Data for TF-BTA Activity (Updated and Corrected) (JASIC) TF-BTA-02-04/Rev.1/Corr.1
25 Apr 2013 Certification test results of the OEM legform used in document GTR9-6-20 (OICA) GTR9-06-28
22 Mar 2013 J-NCAP Test Data for TF-BTA Activity (updated) (JASIC) TF-BTA-02-04/Rev.1
21 Mar 2013 Comments on document GTR9-06-15 (BASt) GTR9-06-25
21 Mar 2013 JASIC Comments on Alliance and JP Research Documents (JASIC) GTR9-06-27
← Previous Page 2 of 3 Next →