6 Sep 2013
Comparison of Effect of Different Approaches on Injury Risk Functions
(JASIC)
GTR9-08-11
6 Sep 2013
Draft agenda for the 8th GTR 9-Phase 2 informal group session
GTR9-08-01
6 Sep 2013
GTR9 – Draft Working Document of IG GTR9 PH2 (Version 1: 04 Sept. 2013)
GTR9-08-03
6 Sep 2013
GTR9 – Draft Preamble of IG GTR9 PH2 (Version 1: 04 Sept. 2013)
GTR9-08-04
6 Sep 2013
GTR No. 9 – Draft proposal for Amendment 2
GTR9-08-06
6 Sep 2013
Proposed title block for GTR 9 regulation drawings
(Humanetics)
GTR9-08-07
6 Sep 2013
Comments to JAMA presentation GTR9-7-06c and Proposed Changes, Flex PLI GTR Manual
(Humanetics)
GTR9-08-08
6 Sep 2013
Humanetics Comments to Cellbond Flex PLI Drawing Check Document
(Humanetics)
GTR9-08-09
6 Sep 2013
Humanetics comments to JASIC Flex drawing review
(Humanetics)
GTR9-08-10
27 Aug 2013
Fourth progress report for Phase 2 of GTR No. 9
WP.29/2013/129
24 Jul 2013
Collation of FlexPLI Inverse Certification Test Results (revised)
(BASt)
GTR9-07-17/Rev.1
24 Jul 2013
Collation of FlexPLI Pendulum Certification Test Results (revised)
(BASt)
GTR9-07-16/Rev.1
24 Jul 2013
Draft minutes of the 7th GTR 9-Phase II informal group session
GTR9-07-02
18 Jul 2013
Final agenda for the 7th GTR 9-Phase II informal group session
GTR9-07-01/Rev.1
5 Jul 2013
Revised draft minutes of the 6th GTR 9-Phase 2 informal group session
GTR9-06-02/Rev.1
5 Jul 2013
Collation of FlexPLI Inverse Certification Test Results
(BASt)
GTR9-07-17
5 Jul 2013
Collation of FlexPLI Pendulum Certification Test Results
(BASt)
GTR9-07-16
5 Jul 2013
BASt comments on document GTR9-07-13: JASIC position on FlexPLI rebound phase
(BASt)
GTR9-07-15
5 Jul 2013
Flex PLI: Detailed Review of Drawing Package and Itemized Check against Master Leg Impactor SN03
(BASt, BGS)
GTR9-07-14
2 Jul 2013
Result of the FlexPLI manual review
(JASIC)
GTR9-07-06/Corr.1
2 Jul 2013
FlexPLI: Result of drawing review (surface level)
(JASIC)
GTR9-07-05/Corr.1
2 Jul 2013
FlexPLI Rebound Phase
(JASIC)
GTR9-07-13
2 Jul 2013
FlexPLI: Injury probability function for tibia fracture and MCL failure
(JASIC)
GTR9-07-07
2 Jul 2013
Flex-GTR Master Leg Development and Evaluation
(JASIC)
GTR9-07-08
2 Jul 2013
Flex PLI Logbook for the IG GTR9-PH2 Round Robin Tests
(BGS)
GTR9-07-10
2 Jul 2013
Flex-GTR Master Leg Level Impactor Test Data: Pendulum Test
(JASIC)
GTR9-07-09
2 Jul 2013
Flex PLI Logbook for the IG GTR9-PH2 Round Robin Tests
(BGS)
GTR9-07-11
2 Jul 2013
Flex PLI Logbook for the IG GTR9-PH2 Round Robin Tests
(BGS)
GTR9-07-12
26 Jun 2013
Fourth progress report of the informal group on Phase 2 of GTR No. 9
WP.29-160-37
25 Jun 2013
FlexPLI version GTR drawing package: revision (zip compressed file)
(Humanetics)
GTR9-05-31/Rev.1
25 Jun 2013
Flex PLI drawing review
(Cellbond)
GTR9-06-23/Rev.2
25 Jun 2013
Draft running order of the provisional agenda for the 7th GTR 9-Phase 2 informal group session
GTR9-07-03
25 Jun 2013
Information on GTR 9-related drawing packages
GTR9-07-04
18 Jun 2013
Draft agenda for the 7th GTR 9-Phase II informal group session
GTR9-07-01
3 Jun 2013
Draft minutes of the 6th GTR 9-Phase 2 informal group session
GTR9-06-02
30 May 2013
FlexPLI behaviour in outer area: Expanded version
(OICA)
TF-BTA-03-03/Rev.1
30 May 2013
Task Force-Bumper Test Area: EC Study Update: revised
(TRL)
TF-BTA-03-06/Rev.1
30 May 2013
Final minutes of the 2nd TF-BTA meeting
TF-BTA-02-02/Rev.1
29 May 2013
Draft minutes of the 3rd TF-BTA meeting
TF-BTA-03-02
27 May 2013
Fourth progress report of the informal group on Phase 2 of GTR No. 9
WP.29-160-13
18 May 2013
GTR No. 9 – Draft proposal for Amendment 2
GRSP-53-29
17 May 2013
Audi A3 and VW Golf 7: Legform testing and width of bumper test areas
(OICA)
TF-BTA-03-10
17 May 2013
FlexPLI and EEVC legform behavior outside the regulatory BTA
(Renault, ACEA, OICA)
TF-BTA-03-08
17 May 2013
Pedestrian Protection: Assessment with lower legform at BTA limits and beyond
(OICA)
TF-BTA-03-07
17 May 2013
Draft fourth progress report of the informal group on Phase 2 of GTR No. 9
GRSP-53-28
15 May 2013
J-NCAP Test Data for TF-BTA Activity (Updated and Corrected)
(JASIC)
TF-BTA-02-04/Rev.1/Corr.1
25 Apr 2013
Certification test results of the OEM legform used in document GTR9-6-20
(OICA)
GTR9-06-28
22 Mar 2013
J-NCAP Test Data for TF-BTA Activity (updated)
(JASIC)
TF-BTA-02-04/Rev.1
21 Mar 2013
Comments on document GTR9-06-15
(BASt)
GTR9-06-25
21 Mar 2013
JASIC Comments on Alliance and JP Research Documents
(JASIC)
GTR9-06-27
No matching documents.