Informal Group on GTR 9-Phase 2
← GTR9 7
GTR9 9 →
9-10 Sep 2013  · Paris
Agenda All Documents Informal
Latest Documents
GTR9-08-01 Draft agenda for the 8th GTR 9-Phase 2 informal group session 6 Sep 2013
GTR9-08-01/Rev.1 Final agenda for the 8th GTR 9-Phase 2 informal group session 10 Sep 2013
GTR9-08-02 Draft minutes of the 8th GTR 9-Phase II informal group session 23 Nov 2013
GTR9-08-02/Rev.1 Final minutes of the 8th session of the GTR9-Phase 2 informal group 16 Dec 2013
GTR9-08-03 GTR9 – Draft Working Document of IG GTR9 PH2 (Version 1: 04 Sept. 2013) 6 Sep 2013
GTR9-08-03/Rev.1 GTR9 – Draft Working Document of IG GTR9 PH2 (Version 2: 10 Sept. 2013) 12 Sep 2013
GTR9-08-04 GTR9 – Draft Preamble of IG GTR9 PH2 (Version 1: 04 Sept. 2013) 6 Sep 2013
GTR9-08-05 No document in the database
GTR9-08-06 GTR No. 9 – Draft proposal for Amendment 2 6 Sep 2013
GTR9-08-07 Proposed title block for GTR 9 regulation drawings (Humanetics) 6 Sep 2013
GTR9-08-08 Comments to JAMA presentation GTR9-7-06c and Proposed Changes, Flex PLI GTR Manual (Humanetics) 6 Sep 2013
GTR9-08-08/Rev.1 Revised Comments to JAMA Presentation GTR9-7-06c and Proposed Changes, FlexPLI GTR Manual (Humanetics) 30 Jan 2017
GTR9-08-09 Humanetics Comments to Cellbond Flex PLI Drawing Check Document (Humanetics) 6 Sep 2013
GTR9-08-10 Humanetics comments to JASIC Flex drawing review (Humanetics) 6 Sep 2013
GTR9-08-11 Comparison of Effect of Different Approaches on Injury Risk Functions (JASIC) 6 Sep 2013
GTR9-08-12 Possible Influence of Temperature & Humidity on the FlexPLI Behaviour (OICA) 10 Sep 2013
GTR9-08-13 FlexPLI Manual: FlexPLI Preparation before Car Testing (OICA) 9 Sep 2013
GTR9-08-14 Request for Transitional Provisions for FlexPLI Usage (OICA) 10 Sep 2013
GTR9-08-15 FlexPLI Biofidelic Assesment Interval (BAI): Open Issues (BASt) 10 Sep 2013
GTR9-08-16 Change to foam flesh used by EEVC lower & upper legforms (TRL) 10 Sep 2013
GTR9-08-17 FlexPLI Version GTR Testing of Vehicles with Different Bumper Systems (OICA) 10 Sep 2013
GTR9-08-18 Femur Certification Corridors for the Inverse Test (Zero Cross Timing) (JASIC) 10 Sep 2013
GTR9-08-19 Femur Certification Corridors for the Pendulum Test (Zero Cross Timing) (JASIC) 10 Sep 2013