previous meeting next meeting
Washington, DC
(Latest 10 September 2013)
Agenda
12 March 2013 Draft agenda for the 6th GTR 9-Phase 2 informal group session
GTR9-06-01
GTR9-06-01 2013-03-12
19 March 2013 Revised draft agenda for the 6th GTR9-Phase 2 informal group session
GTR9-06-01/Rev.1
GTR9-06-01/Rev.1 2013-03-19
3 June 2013 Draft minutes of the 6th GTR 9-Phase 2 informal group session
GTR9-06-02
GTR9-06-02 2013-06-03
5 July 2013 Revised draft minutes of the 6th GTR 9-Phase 2 informal group session
GTR9-06-02/Rev.1
GTR9-06-02/Rev.1 2013-07-05
10 September 2013 Final minutes of the 6th GTR 9-Phase 2 informal group session
GTR9-06-02/Rev.2
GTR9-06-02/Rev.2 2013-09-10
12 March 2013 FlexPLI Testing: Propelling Accuracy (OICA)
GTR9-06-03
GTR9-06-03 2013-03-12
12 March 2013 Mutual Resolution 1 guidelines for test tools
GTR9-06-04
GTR9-06-04 2013-03-12
12 March 2013 Schedule for preparing an addendum to MR 1 for FlexPLI test tool
GTR9-06-05
GTR9-06-05 2013-03-12
12 March 2013 FlexPLI GTR User Manual Rev. E 2013 (Humanetics)
GTR9-06-06
GTR9-06-06 2013-03-12
12 March 2013 Proposal for a Definition of the FlexPLI Biofidelic Assessment Interval (BAI) (BASt)
GTR9-06-07
GTR9-06-07 2013-03-12
12 March 2013 Derivation of Draft FlexPLI prototype impactor limits (BASt)
GTR9-06-08
GTR9-06-08 2013-03-12
21 March 2013 Derivation of Draft FlexPLI prototype impactor limits (revised) (BASt)
GTR9-06-08/Rev.1
GTR9-06-08/Rev.1 2013-03-21
12 March 2013 Review of FlexPLI drawing package and consistency check against hardware (BASt)
GTR9-06-09
GTR9-06-09 2013-03-12
12 March 2013 FlexPLI Pre- and Post-Test Procedure (BASt)
GTR9-06-10
GTR9-06-10 2013-03-12
14 March 2013 Consideration of the rebound phase in GTR 9 FlexPLI test procedure (JASIC)
GTR9-06-11
GTR9-06-11 2013-03-14
14 March 2013 Validation of Pedestrian Safety Flex-GTR model (JASIC)
GTR9-06-12
GTR9-06-12 2013-03-14
14 March 2013 Proposal for an amendment to GTR 9 to define "primary peference marks" (OICA)
GTR9-06-13
GTR9-06-13 2013-03-14
14 March 2013 Pedestrian safety FlexPLI round robin testing (NHTSA)
GTR9-06-14
GTR9-06-14 2013-03-14
14 March 2013 JP Research review of JASIC & BASt Flex-PLI Injury Reduction Estimate (Alliance and JP Research)
GTR9-06-15
GTR9-06-15 2013-03-14
17 March 2013 JP Research review of JASIC & BASt Flex-PLI Injury Reduction Estimate: Revised (JP Research and Alliance)
GTR9-06-15/Rev.1
GTR9-06-15/Rev.1 2013-03-17
14 March 2013 JP Research summary of its review of FlexPLI injury reduction estimates (JP Research)
GTR9-06-16
GTR9-06-16 2013-03-14
17 March 2013 Pedestrian Protection: Large Truck/SUV Challenges (Alliance)
GTR9-06-17
GTR9-06-17 2013-03-17
17 March 2013 Ford GTR09 US Vehicle Round Robin (Ford)
GTR9-06-18
GTR9-06-18 2013-03-17
17 March 2013 Shape Corp.: GTR09 NA vs EU Vehicle Modified Round Robin (Shape)
GTR9-06-19
GTR9-06-19 2013-03-17
20 March 2013 Shape Corp.: GTR09 NA vs EU Vehicle Modified Round Robin: Revision 1 (Shape)
GTR9-06-19/Rev.1
GTR9-06-19/Rev.1 2013-03-20
16 March 2013 Discussion on Impactor Thresholds (OICA)
GTR9-06-20
GTR9-06-20 2013-03-16
17 March 2013 Proposal on FlexPLI measuring results and Flex-PLI requirements of GTR9-PH2 (OICA)
GTR9-06-21
GTR9-06-21 2013-03-17
17 March 2013 FlexPLI Drawing Review (surface level) Update (JASIC)
GTR9-06-22
GTR9-06-22 2013-03-17
17 March 2013 FlexPLI Drawing Review (Cellbond)
GTR9-06-23
GTR9-06-23 2013-03-17
21 March 2013 FlexPLI Drawing Review (revised) (Cellbond)
GTR9-06-23/Rev.1
GTR9-06-23/Rev.1 2013-03-21
25 June 2013 Flex PLI drawing review (Cellbond)
GTR9-06-23/Rev.2
GTR9-06-23/Rev.2 2013-06-25
19 March 2013 Durability Study FlexPLI SN03 at Bertrandt Laboratory (Bertrandt)
GTR9-06-24
GTR9-06-24 2013-03-19
21 March 2013 Comments on document GTR9-06-15 (BASt)
GTR9-06-25
GTR9-06-25 2013-03-21
21 March 2013 Injury Probability Functions for the Flexible Pedestrian Legform Impactor (SAE and JASIC)
GTR9-06-26
GTR9-06-26 2013-03-21
21 March 2013 JASIC Comments on Alliance and JP Research Documents (JASIC)
GTR9-06-27
GTR9-06-27 2013-03-21
25 April 2013 Certification test results of the OEM legform used in document GTR9-6-20 (OICA)
GTR9-06-28
GTR9-06-28 2013-04-25