previous meeting | next meeting |
19 June 2015
Invitation to the 12th session of the WLTP informal working group
WLTP-12-01
|
WLTP-12-01 | 2015-06-19 |
19 June 2015
Attachment to the WLTP-12 invitation: Directions to the office of JASIC
WLTP-12-01/Att.1
|
WLTP-12-01/Att.1 | 2015-06-19 |
19 June 2015
Attachment to the WLTP-12 invitation: Tokyo Hotel Accommodations
WLTP-12-01/Att.2
|
WLTP-12-01/Att.2 | 2015-06-19 |
19 June 2015
Attachment to the WLTP-12 invitation: Tokyo Metro Subway Map
WLTP-12-01/Att.3
|
WLTP-12-01/Att.3 | 2015-06-19 |
19 June 2015
Attachment to the WLTP-12 invitation: Suica-Pasmo Card Tokyo network
WLTP-12-01/Att.4
|
WLTP-12-01/Att.4 | 2015-06-19 |
17 September 2015
Draft agenda for the 12th WLTP informal group session
WLTP-12-02/Rev.1
|
WLTP-12-02/Rev.1 | 2015-09-17 |
17 September 2015
WLTP informal group open issues table
WLTP-12-03
|
WLTP-12-03 | 2015-09-17 |
23 September 2015
GTR No. 15 (WLTP) Phase 1b: Working draft text (Clean version)
WLTP-12-04/a
|
WLTP-12-04/a | 2015-09-23 |
23 September 2015
GTR No. 15 (WLTP) Phase 1b: Working draft text as of 20 September 2015
WLTP-12-04/b
|
WLTP-12-04/b | 2015-09-23 |
17 September 2015
GTR No. 15 (WLTP) Phase 1b final draft text of torque-meter related provisions
WLTP-12-05
|
WLTP-12-05 | 2015-09-17 |
1 October 2015
GTR No. 15 (WLTP) Phase 1b final draft text of torque-meter related provisions (Revised)
WLTP-12-05/Rev.1
|
WLTP-12-05/Rev.1 | 2015-10-01 |
17 September 2015
GTR No. 15 (WLTP) Phase 1b final draft text with regard to on-board anemometry
WLTP-12-06
|
WLTP-12-06 | 2015-09-17 |
17 September 2015
GTR No. 15 (WLTP) Phase 1b final draft text concerning the road load family matrix
WLTP-12-07
|
WLTP-12-07 | 2015-09-17 |
1 October 2015
GTR No. 15 (WLTP) Phase 1b: Final draft text concerning the road load family matrix (Revised)
WLTP-12-07/Rev.1
|
WLTP-12-07/Rev.1 | 2015-10-01 |
18 September 2015
WLTP presentation: Result Postprocessing Proposal (BMW)
WLTP-12-08
|
WLTP-12-08 | 2015-09-18 |
25 September 2015
WLTP presentation: Result Postprocessing Proposal (Revised) (BMW)
WLTP-12-08/Rev.1
|
WLTP-12-08/Rev.1 | 2015-09-25 |
18 September 2015
WLTP Result Postprocessing Proposal (BMW)
WLTP-12-09
|
WLTP-12-09 | 2015-09-18 |
25 September 2015
WLTP Result Postprocessing Proposal (Revised) (BMW)
WLTP-12-09/Rev.1
|
WLTP-12-09/Rev.1 | 2015-09-25 |
18 September 2015
WLTP result postprocessing tool (BMW)
WLTP-12-10
|
WLTP-12-10 | 2015-09-18 |
25 September 2015
WLTP result postprocessing tool (Revised) (BMW)
WLTP-12-10/Rev.1
|
WLTP-12-10/Rev.1 | 2015-09-25 |
21 September 2015
GTR No. 15 (WLTP) Phase 1b: Proposal for definitions
WLTP-12-11
|
WLTP-12-11 | 2015-09-21 |
21 September 2015
GTR No. 15 (WLTP) Phase 1b: Proposal for particle definitions
WLTP-12-12
|
WLTP-12-12 | 2015-09-21 |
25 September 2015
GTR No. 15 (WLTP) Phase 1b review of open and closed drafting issues
WLTP-12-13
|
WLTP-12-13 | 2015-09-25 |
25 September 2015
GTR No. 15 (WLTP) Phase 1b: Wind tunnel method and chassis dyno prescriptions (revision 2) (BMW, UTAC, and VW)
WLTP-12-14
|
WLTP-12-14 | 2015-09-25 |
25 September 2015
GTR No. 15 (WLTP) Phase 1b: Progress report of the task force on minimizing the number of tests
WLTP-12-15
|
WLTP-12-15 | 2015-09-25 |
25 September 2015
GTR No. 15 (WLTP) Phase 1b: Draft GTR text concerning the number of tests
WLTP-12-16
|
WLTP-12-16 | 2015-09-25 |
29 September 2015
GTR No. 15 (WLTP) Phase 1b: Draft GTR text concerning the number of tests
WLTP-12-16/Rev.2
|
WLTP-12-16/Rev.2 | 2015-09-29 |
25 September 2015
GTR No. 15 (WLTP) Phase 1b: Status report on the resolution of gearshift open issues
WLTP-12-17
|
WLTP-12-17 | 2015-09-25 |
1 October 2015
GTR No. 15 (WLTP) Phase 1b: Status report on the resolution of gearshift open issues (Revised)
WLTP-12-17/Rev.1
|
WLTP-12-17/Rev.1 | 2015-10-01 |
25 September 2015
GTR No. 15 (WLTP) Phase 1b: Report on the status of GTR text drafting issues
WLTP-12-18
|
WLTP-12-18 | 2015-09-25 |
25 September 2015
GTR No. 15 (WLTP) Phase 1b: Status report on the testing of electric vehicles
WLTP-12-19
|
WLTP-12-19 | 2015-09-25 |
14 October 2015
GTR No. 15 (WLTP) Phase 1b: Status report on the testing of electric vehicles (revised)
WLTP-12-19/Rev.1
|
WLTP-12-19/Rev.1 | 2015-10-14 |
25 September 2015
GTR No. 15 (WLTP) Phase 1b: Final review of GTR definitions
WLTP-12-20
|
WLTP-12-20 | 2015-09-25 |
25 September 2015
GTR No. 15 (WLTP) Phase 1b: Final draft GTR text concerning the wind tunnel method
WLTP-12-21
|
WLTP-12-21 | 2015-09-25 |
25 September 2015
GTR No. 15 (WLTP) Phase 1b: Status report on control of additional pollutants (JRC)
WLTP-12-22
|
WLTP-12-22 | 2015-09-25 |
28 September 2015
GTR No. 15 (WLTP) Phase 1b: Proposal for control of additional pollutants
WLTP-12-23
|
WLTP-12-23 | 2015-09-28 |
28 September 2015
GTR No. 15 (WLTP) Phase 1b: Road Load Matrix Family (RDW and ACEA)
WLTP-12-24
|
WLTP-12-24 | 2015-09-28 |
28 September 2015
GTR No. 15 (WLTP) Phase 1b: Progress report on Annex 4 road load determination
WLTP-12-25
|
WLTP-12-25 | 2015-09-28 |
28 September 2015
GTR No. 15 (WLTP) Phase 1b: Review of tolerances under Annex 4 (BMW and TNO)
WLTP-12-26
|
WLTP-12-26 | 2015-09-28 |
29 September 2015
GTR No. 15 (WLTP) Phase 1b: Proposal for “Speed Trace Violations/Drive Trace Index”
WLTP-12-27
|
WLTP-12-27 | 2015-09-29 |
29 September 2015
Draft agenda for the 5th WLTP Drafting subgroup session
WLTP-12-28
|
WLTP-12-28 | 2015-09-29 |
1 October 2015
WLTP: Study on Evaluation Criteria of Road Load Tolerance in Korea (KATRI)
WLTP-12-29/Rev.1
|
WLTP-12-29/Rev.1 | 2015-10-01 |
1 October 2015
GTR No. 15 (WLTP) validation phase 2 presentation (JRC)
WLTP-12-30
|
WLTP-12-30 | 2015-10-01 |
1 October 2015
Measurement of ethanol, formaldehyde and acetaldehyde from a flex-fuel vehicle exhaust over the WLTC (AVL, JRC, and Horiba)
WLTP-12-31
|
WLTP-12-31 | 2015-10-01 |
15 October 2015
GTR No. 15 (WLTP): Interim results of the Asian round-robin validation testing (Japan)
WLTP-12-32
|
WLTP-12-32 | 2015-10-15 |
15 October 2015
Minutes of the 12th WLTP informal working group session
WLTP-12-33
|
WLTP-12-33 | 2015-10-15 |