|
9 Jan 2013
|
Draft minutes of the 5th GTR 9-Phase 2 informal group session
|
GTR9-05-02
|
|
9 Jan 2013
|
Initial OICA comments on document GTR9-05-20 (OICA)
|
GTR9-05-23/Corr.1
|
|
9 Jan 2013
|
GTR 9-Phase 2 informal group action list: Revision 1
|
GTR9-04-03/Rev.1
|
|
11 Jan 2013
|
FlexPLI version GTR drawing package (zip compressed file) (Humanetics)
|
GTR9-05-31
|
|
6 Feb 2013
|
Final report (corrected) of the 4th GTR 9-Phase 2 informal group session
|
GTR9-04-02/Rev.2
|
|
12 Mar 2013
|
Draft agenda for the 6th GTR 9-Phase 2 informal group session
|
GTR9-06-01
|
|
12 Mar 2013
|
FlexPLI Testing: Propelling Accuracy (OICA)
|
GTR9-06-03
|
|
12 Mar 2013
|
Mutual Resolution 1 guidelines for test tools
|
GTR9-06-04
|
|
12 Mar 2013
|
Schedule for preparing an addendum to MR 1 for FlexPLI test tool
|
GTR9-06-05
|
|
12 Mar 2013
|
FlexPLI GTR User Manual Rev. E 2013 (Humanetics)
|
GTR9-06-06
|
|
12 Mar 2013
|
Proposal for a Definition of the FlexPLI Biofidelic Assessment Interval (BAI) (BASt)
|
GTR9-06-07
|
|
12 Mar 2013
|
Derivation of Draft FlexPLI prototype impactor limits (BASt)
|
GTR9-06-08
|
|
12 Mar 2013
|
Review of FlexPLI drawing package and consistency check against hardware (BASt)
|
GTR9-06-09
|
|
12 Mar 2013
|
FlexPLI Pre- and Post-Test Procedure (BASt)
|
GTR9-06-10
|
|
14 Mar 2013
|
Consideration of the rebound phase in GTR 9 FlexPLI test procedure (JASIC)
|
GTR9-06-11
|
|
14 Mar 2013
|
Validation of Pedestrian Safety Flex-GTR model (JASIC)
|
GTR9-06-12
|
|
14 Mar 2013
|
Proposal for an amendment to GTR 9 to define "primary peference marks" (OICA)
|
GTR9-06-13
|
|
14 Mar 2013
|
Pedestrian safety FlexPLI round robin testing (NHTSA)
|
GTR9-06-14
|
|
14 Mar 2013
|
JP Research review of JASIC & BASt Flex-PLI Injury Reduction Estimate (Alliance and JP Research)
|
GTR9-06-15
|
|
14 Mar 2013
|
JP Research summary of its review of FlexPLI injury reduction estimates (JP Research)
|
GTR9-06-16
|
|
16 Mar 2013
|
Discussion on Impactor Thresholds (OICA)
|
GTR9-06-20
|
|
17 Mar 2013
|
JP Research review of JASIC & BASt Flex-PLI Injury Reduction Estimate: Revised (JP Research and Alliance)
|
GTR9-06-15/Rev.1
|
|
17 Mar 2013
|
Pedestrian Protection: Large Truck/SUV Challenges (Alliance)
|
GTR9-06-17
|
|
17 Mar 2013
|
Ford GTR09 US Vehicle Round Robin (Ford)
|
GTR9-06-18
|
|
17 Mar 2013
|
Shape Corp.: GTR09 NA vs EU Vehicle Modified Round Robin (Shape)
|
GTR9-06-19
|
|
17 Mar 2013
|
Proposal on FlexPLI measuring results and Flex-PLI requirements of GTR9-PH2 (OICA)
|
GTR9-06-21
|
|
17 Mar 2013
|
FlexPLI Drawing Review (surface level) Update (JASIC)
|
GTR9-06-22
|
|
17 Mar 2013
|
FlexPLI Drawing Review (Cellbond)
|
GTR9-06-23
|
|
19 Mar 2013
|
Revised draft agenda for the 6th GTR9-Phase 2 informal group session
|
GTR9-06-01/Rev.1
|
|
19 Mar 2013
|
Durability Study FlexPLI SN03 at Bertrandt Laboratory (Bertrandt)
|
GTR9-06-24
|
|
19 Mar 2013
|
Final minutes of the 5th GTR 9-Phase 2 informal group session
|
GTR9-05-02/Rev.1
|
|
20 Mar 2013
|
Shape Corp.: GTR09 NA vs EU Vehicle Modified Round Robin: Revision 1 (Shape)
|
GTR9-06-19/Rev.1
|
|
21 Mar 2013
|
Injury Probability Functions for the Flexible Pedestrian Legform Impactor (SAE and JASIC)
|
GTR9-06-26
|
|
21 Mar 2013
|
Derivation of Draft FlexPLI prototype impactor limits (revised) (BASt)
|
GTR9-06-08/Rev.1
|
|
21 Mar 2013
|
FlexPLI Drawing Review (revised) (Cellbond)
|
GTR9-06-23/Rev.1
|
|
21 Mar 2013
|
JASIC Comments on Alliance and JP Research Documents (JASIC)
|
GTR9-06-27
|
|
21 Mar 2013
|
Comments on document GTR9-06-15 (BASt)
|
GTR9-06-25
|
|
25 Apr 2013
|
Certification test results of the OEM legform used in document GTR9-6-20 (OICA)
|
GTR9-06-28
|
|
3 Jun 2013
|
Draft minutes of the 6th GTR 9-Phase 2 informal group session
|
GTR9-06-02
|
|
18 Jun 2013
|
Draft agenda for the 7th GTR 9-Phase II informal group session
|
GTR9-07-01
|
|
25 Jun 2013
|
Information on GTR 9-related drawing packages
|
GTR9-07-04
|
|
25 Jun 2013
|
Draft running order of the provisional agenda for the 7th GTR 9-Phase 2 informal group session
|
GTR9-07-03
|
|
25 Jun 2013
|
Flex PLI drawing review (Cellbond)
|
GTR9-06-23/Rev.2
|
|
25 Jun 2013
|
FlexPLI version GTR drawing package: revision (zip compressed file) (Humanetics)
|
GTR9-05-31/Rev.1
|
|
2 Jul 2013
|
Flex PLI Logbook for the IG GTR9-PH2 Round Robin Tests (BGS)
|
GTR9-07-12
|
|
2 Jul 2013
|
Flex PLI Logbook for the IG GTR9-PH2 Round Robin Tests (BGS)
|
GTR9-07-11
|
|
2 Jul 2013
|
Flex-GTR Master Leg Level Impactor Test Data: Pendulum Test (JASIC)
|
GTR9-07-09
|
|
2 Jul 2013
|
Flex PLI Logbook for the IG GTR9-PH2 Round Robin Tests (BGS)
|
GTR9-07-10
|
|
2 Jul 2013
|
Flex-GTR Master Leg Development and Evaluation (JASIC)
|
GTR9-07-08
|
|
2 Jul 2013
|
FlexPLI: Injury probability function for tibia fracture and MCL failure (JASIC)
|
GTR9-07-07
|
|
2 Jul 2013
|
FlexPLI Rebound Phase (JASIC)
|
GTR9-07-13
|
|
2 Jul 2013
|
FlexPLI: Result of drawing review (surface level) (JASIC)
|
GTR9-07-05/Corr.1
|
|
2 Jul 2013
|
Result of the FlexPLI manual review (JASIC)
|
GTR9-07-06/Corr.1
|
|
5 Jul 2013
|
Flex PLI: Detailed Review of Drawing Package and Itemized Check against Master Leg Impactor SN03 (BASt and BGS)
|
GTR9-07-14
|
|
5 Jul 2013
|
BASt comments on document GTR9-07-13: JASIC position on FlexPLI rebound phase (BASt)
|
GTR9-07-15
|
|
5 Jul 2013
|
Collation of FlexPLI Pendulum Certification Test Results (BASt)
|
GTR9-07-16
|
|
5 Jul 2013
|
Collation of FlexPLI Inverse Certification Test Results (BASt)
|
GTR9-07-17
|
|
5 Jul 2013
|
Revised draft minutes of the 6th GTR 9-Phase 2 informal group session
|
GTR9-06-02/Rev.1
|
|
18 Jul 2013
|
Final agenda for the 7th GTR 9-Phase II informal group session
|
GTR9-07-01/Rev.1
|
|
24 Jul 2013
|
Draft minutes of the 7th GTR 9-Phase II informal group session
|
GTR9-07-02
|
|
24 Jul 2013
|
Collation of FlexPLI Pendulum Certification Test Results (revised) (BASt)
|
GTR9-07-16/Rev.1
|
|
24 Jul 2013
|
Collation of FlexPLI Inverse Certification Test Results (revised) (BASt)
|
GTR9-07-17/Rev.1
|
|
6 Sep 2013
|
Humanetics comments to JASIC Flex drawing review (Humanetics)
|
GTR9-08-10
|
|
6 Sep 2013
|
Humanetics Comments to Cellbond Flex PLI Drawing Check Document (Humanetics)
|
GTR9-08-09
|
|
6 Sep 2013
|
Comments to JAMA presentation GTR9-7-06c and Proposed Changes, Flex PLI GTR Manual (Humanetics)
|
GTR9-08-08
|
|
6 Sep 2013
|
Proposed title block for GTR 9 regulation drawings (Humanetics)
|
GTR9-08-07
|
|
6 Sep 2013
|
GTR No. 9 – Draft proposal for Amendment 2
|
GTR9-08-06
|
|
6 Sep 2013
|
GTR9 – Draft Preamble of IG GTR9 PH2 (Version 1: 04 Sept. 2013)
|
GTR9-08-04
|
|
6 Sep 2013
|
GTR9 – Draft Working Document of IG GTR9 PH2 (Version 1: 04 Sept. 2013)
|
GTR9-08-03
|
|
6 Sep 2013
|
Draft agenda for the 8th GTR 9-Phase 2 informal group session
|
GTR9-08-01
|
|
6 Sep 2013
|
Comparison of Effect of Different Approaches on Injury Risk Functions (JASIC)
|
GTR9-08-11
|
|
9 Sep 2013
|
FlexPLI Manual: FlexPLI Preparation before Car Testing (OICA)
|
GTR9-08-13
|
|
10 Sep 2013
|
Possible Influence of Temperature & Humidity on the FlexPLI Behaviour (OICA)
|
GTR9-08-12
|
|
10 Sep 2013
|
Final agenda for the 8th GTR 9-Phase 2 informal group session
|
GTR9-08-01/Rev.1
|
|
10 Sep 2013
|
FlexPLI Version GTR Testing of Vehicles with Different Bumper Systems (OICA)
|
GTR9-08-17
|
|
10 Sep 2013
|
FlexPLI Biofidelic Assesment Interval (BAI): Open Issues (BASt)
|
GTR9-08-15
|
|
10 Sep 2013
|
Request for Transitional Provisions for FlexPLI Usage (OICA)
|
GTR9-08-14
|
|
10 Sep 2013
|
Change to foam flesh used by EEVC lower & upper legforms (TRL)
|
GTR9-08-16
|
|
10 Sep 2013
|
Femur Certification Corridors for the Inverse Test (Zero Cross Timing) (JASIC)
|
GTR9-08-18
|
|
10 Sep 2013
|
Femur Certification Corridors for the Pendulum Test (Zero Cross Timing) (JASIC)
|
GTR9-08-19
|
|
10 Sep 2013
|
Final minutes of the 6th GTR 9-Phase 2 informal group session
|
GTR9-06-02/Rev.2
|
|
10 Sep 2013
|
Final minutes of the 7th GTR 9-Phase 2 informal group session
|
GTR9-07-02/Rev.1
|
|
12 Sep 2013
|
GTR9 – Draft Working Document of IG GTR9 PH2 (Version 2: 10 Sept. 2013)
|
GTR9-08-03/Rev.1
|
|
23 Nov 2013
|
Draft minutes of the 8th GTR 9-Phase II informal group session
|
GTR9-08-02
|
|
7 Dec 2013
|
Draft agenda for the 9th GTR 9-Phase 2 informal group session
|
GTR9-09-01
|
|
7 Dec 2013
|
FlexPLI weight tolerances: Reduction of proposed weight tolerances (OICA)
|
GTR9-09-03
|
|
7 Dec 2013
|
Proposal of 01 series of amendments to Regulation No. 127 (Japan)
|
GTR9-09-05
|
|
7 Dec 2013
|
Proposed amendments of the three-point bending certification test figure in GTR No. 9 (Japan)
|
GTR9-09-06
|
|
12 Dec 2013
|
Flex PLI Review: Dimensional Tolerance (Humanetics)
|
GTR9-09-14
|
|
12 Dec 2013
|
Flex PLI: Flesh Neoprene Corridor (Humanetics)
|
GTR9-09-13
|
|
12 Dec 2013
|
Details of Drawing Updates to Flex GTR9 Regulation Drawings (Humanetics)
|
GTR9-09-12
|
|
12 Dec 2013
|
Flex PLI Review: Weight Tolerance (Humanetics)
|
GTR9-09-10
|
|
12 Dec 2013
|
FlexPLI GTR User Manual Rev. F (Draft) 2013 (Humanetics)
|
GTR9-09-07
|
|
12 Dec 2013
|
Updates to Flex PLI Manual Rev E to Rev F (Humanetics)
|
GTR9-09-08
|
|
12 Dec 2013
|
Flex PLI: Max and Min Femur Certification Analysis (Humanetics)
|
GTR9-09-09
|
|
16 Dec 2013
|
Change to foam flesh used by EEVC lower & upper legforms (TRL)
|
GTR9-09-15
|
|
16 Dec 2013
|
Final agenda for the 9th GTR 9-Phase 2 informal group session
|
GTR9-09-01/Rev.1
|
|
16 Dec 2013
|
Flex PLI GTR: User Manual (Humanetics)
|
GTR9-09-07/Rev.1
|
|
16 Dec 2013
|
Updates to Flex PLI Manual Rev E to Rev F (Humanetics)
|
GTR9-09-08/Rev.1
|
|
16 Dec 2013
|
Final minutes of the 8th session of the GTR9-Phase 2 informal group
|
GTR9-08-02/Rev.1
|
|
16 Dec 2013
|
Lower Legform Test Area: Justification of the Need for a Relaxation Zone (Revised) (OICA)
|
GTR9-09-04/Rev.1
|
|
16 Dec 2013
|
Flex PLI Drawing Review (Cellbond)
|
GTR9-09-16
|