GTR No. 15
← GTR No. 14
GTR No. 16 →
Texts and Appendices Documents Meetings
← Back
Documents 2015 276 documents
30 Dec 2015 Japan proposal for new evaporative emissions test procedure under GTR No. 15 (Japan) WLTP-13-11
30 Dec 2015 GTR No. 15 (WLTP) Phase 2: Further consideration of work items (Japan) WLTP-13-10
30 Dec 2015 GTR No. 15 (WLTP) Phase 2: Work items and schedule WLTP-13-09
30 Dec 2015 Proposed organization for the Phase 2 development of GTR No. 15 WLTP-13-08
30 Dec 2015 Appendix to the draft proposal for amendments to the formal proposal for phase 1b of GTR No. 15 (OICA) WLTP-13-05/App.1
30 Dec 2015 Amendments to the formal GRPE proposal of amendments to GTR No. 15 (OICA) WLTP-13-05
30 Dec 2015 Summary of the remaining issues for phase 1b in the development of GTR No. 15 WLTP-13-04
30 Dec 2015 Open issues table for the 13th WLTP informal group session WLTP-13-03
30 Dec 2015 Draft agenda for the 13th WLTP informal group session WLTP-13-02
30 Dec 2015 Invitation to the 13th WLTP informal group session WLTP-13-01
18 Dec 2015 Draft meeting notes from the 37th PMP session PMP-37-09
18 Dec 2015 Final agenda for the 37th PMP informal group session PMP-37-01/Rev.1
12 Nov 2015 Mandate for the Informal working group on Worldwide harmonized Light duty Test Procedure Phase 2 (WLTP Phase 2) (EC) WP.29-167-29
7 Nov 2015 Transposition of the WLTP GTR into a UN Regulation (EC) WP.29-167-20
3 Nov 2015 Marked up proposal for amendments to GTR No. 15 on Worldwide harmonized Light vehicles Test Procedure GRPE/2016/3/Add.1
3 Nov 2015 Proposal for amendments to GTR No. 15 on Worldwide harmonized Light vehicles Test Procedure GRPE/2016/3
20 Oct 2015 WLTP development: State of play review for the EVE informal group EVE-16-11
15 Oct 2015 Minutes of the 12th WLTP informal working group session WLTP-12-33
15 Oct 2015 GTR No. 15 (WLTP): Interim results of the Asian round-robin validation testing (Japan) WLTP-12-32
14 Oct 2015 GTR No. 15 (WLTP) Phase 1b: Status report on the testing of electric vehicles (revised) WLTP-12-19/Rev.1
8 Oct 2015 Analysis of the WLTP in-use driving behaviour database with respect to acceleration and deceleration phases PMP-37-04
7 Oct 2015 Final notes from the 36th PMP informal group session PMP-36-05
1 Oct 2015 GTR No. 15 (WLTP) Phase 1b final draft text of torque-meter related provisions (Revised) WLTP-12-05/Rev.1
1 Oct 2015 GTR No. 15 (WLTP) Phase 1b: Final draft text concerning the road load family matrix (Revised) WLTP-12-07/Rev.1
1 Oct 2015 GTR No. 15 (WLTP) Phase 1b: Status report on the resolution of gearshift open issues (Revised) WLTP-12-17/Rev.1
1 Oct 2015 WLTP: Study on Evaluation Criteria of Road Load Tolerance in Korea (KATRI) WLTP-12-29/Rev.1
1 Oct 2015 GTR No. 15 (WLTP) validation phase 2 presentation (JRC) WLTP-12-30
1 Oct 2015 Measurement of ethanol, formaldehyde and acetaldehyde from a flex-fuel vehicle exhaust over the WLTC (AVL, JRC, Horiba) WLTP-12-31
29 Sep 2015 Draft agenda for the 5th WLTP Drafting subgroup session WLTP-12-28
29 Sep 2015 GTR No. 15 (WLTP) Phase 1b: Draft GTR text concerning the number of tests WLTP-12-16/Rev.2
29 Sep 2015 GTR No. 15 (WLTP) Phase 1b: Proposal for “Speed Trace Violations/Drive Trace Index” WLTP-12-27
28 Sep 2015 GTR No. 15 (WLTP) Phase 1b: Review of tolerances under Annex 4 (BMW, TNO) WLTP-12-26
28 Sep 2015 GTR No. 15 (WLTP) Phase 1b: Progress report on Annex 4 road load determination WLTP-12-25
28 Sep 2015 GTR No. 15 (WLTP) Phase 1b: Road Load Matrix Family (RDW, ACEA) WLTP-12-24
28 Sep 2015 WLTP Electric Vehicles: Number of tests presentation WLTP-SG-EV-10-09
28 Sep 2015 WLTP Electric Vehicles: Number of tests (Revision 9) WLTP-SG-EV-10-08
28 Sep 2015 WLTP Annex 8: Cycle modification for vehicles with a maximum speed lower than the maximum speed of the cycle WLTP-SG-EV-10-07
28 Sep 2015 WLTP Electric Vehicles: Calculation of all-electric range city mode (AERcity)-UBE determination (VW) WLTP-SG-EV-10-06
28 Sep 2015 WLTP Electric Vehicles: Current measurement WLTP-SG-EV-10-05
28 Sep 2015 WLTP Electric Vehicles: Cycle modification WLTP-SG-EV-10-04
28 Sep 2015 WLTP Electric Vehicles: RCB determination limits draft text WLTP-SG-EV-10-03
28 Sep 2015 WLTP Electric Vehicles: RCB determination limits WLTP-SG-EV-10-02
28 Sep 2015 Draft agenda for the 10th WLTP Eletric Vehicles Subgroup session WLTP-SG-EV-10-01
28 Sep 2015 GTR No. 15 (WLTP) Phase 1b: Proposal for control of additional pollutants WLTP-12-23
25 Sep 2015 GTR No. 15 (WLTP) Phase 1b: Status report on control of additional pollutants (JRC) WLTP-12-22
25 Sep 2015 GTR No. 15 (WLTP) Phase 1b: Final draft GTR text concerning the wind tunnel method WLTP-12-21
25 Sep 2015 GTR No. 15 (WLTP) Phase 1b: Final review of GTR definitions WLTP-12-20
25 Sep 2015 GTR No. 15 (WLTP) Phase 1b: Status report on the testing of electric vehicles WLTP-12-19
25 Sep 2015 GTR No. 15 (WLTP) Phase 1b: Report on the status of GTR text drafting issues WLTP-12-18
25 Sep 2015 GTR No. 15 (WLTP) Phase 1b: Status report on the resolution of gearshift open issues WLTP-12-17
Page 1 of 6 Next →