GTR Drafting Task Force of the QRTV GTR Informal Group
GTRQRTV-TF 2 →
5-6 Sep 2013  · Rolle
Agenda All Documents Informal Report
← Agenda Item 4. Agenda Item 6. →
5. Development of draft of specifications and requirements for GTR

5.1 Performance requirements

In order to determine standpoints of the CPs that were present during the meeting, COM had prepared a list of basic performance requirements that shall formulate the technical framework of the GTR. Each of the requirements was briefly discussed. Subsequently, each CP gave its opinion which was noted in the list.

5.2 Test procedure

ISO gave an update on the development of test protocol SAE J2889-1/ISO 16254. As there are no substantial changes to the procedure, the presentation basically was a repetition of the one from the last meeting.

5.3 Other development of the draft GTR document

The Task Force focused on the text that was not discussed during the latest official meeting of the IG GTR for QRTV. In this manner, the text has been commented upon and suggestions with respect to the streamlining of the text have been recorded. The text in the linked document represents its latest status and will be the base for continued discussions during the following meeting.