previous meeting | next meeting |
1. | Opening |
Mr Schauer welcomed the participants and thanked Mr Reichert and BMVBS for the invitation and the hosting of the meeting. He opened the meeting at 08:00 hrs. |
||||||||||||||||||
2. | Roll call of the participants |
The participants introduced themselves (see also Document TFAC 02-07). |
||||||||||||||||||
3. | Continuation of the Review of the Document |
The discussion continued in the meeting starting with Chapter 5 of Annex 5. Amendments have been included in document TFAC 02-13 Draft Agricultural Couplings_2013-06-25. It was discussed in general whether the static testing of couplings, which is presently state of legislation in the EU up to a maximum design speed of 40 km/h should also be included in the UN Regulation. During this discussion, a common position could not be established. Therefore it was agreed that a document with arguments to keep current EU legislation (static test) should be prepared and during the next meeting it shall be aimed at reaching consensus on this topic.
TFAC-02-13 | Draft text for mechanical couplings of agricultural vehicles (version 25 June 2013)
Report on the status of the agreed activities: Proposal for Class q and r (CUNA Couplings) Proposal for Class I, proposal for clause 4.10 The proposal for clause 4.10 in document TFAC 02-05 was accepted. Compare proposals Va and V Check possibility for a vehicle approval according to Chapter 5 of R 55 Consider IT-Proposals for Annex 4
TFAC-02-05 | Proposal concerning agricutural vehicle coupling devices
Schauer proposals concerning classification of tractor drawbars and their hitch rings and to limit the coupling device actuating force to 40 daN.
TFAC-02-05 | Proposal concerning agricutural vehicle coupling devices
Schauer proposals concerning classification of tractor drawbars and their hitch rings and to limit the coupling device actuating force to 40 daN.
|
||||||||||||||||||
4. | Further steps |
The activities mentioned on the top of the minutes were agreed:
|
||||||||||||||||||
5. | Any other business |
The dates of the 3rd (2013-09-25/26, Bologna) meeting were agreed. At the end of the meeting, Mr Schauer thanked Mr Reichert again for hosting the meeting and providing meeting location for the 2nd meeting of TFAC. Mr Schauer closed the meeting at 16:00 hrs. |