|
17 Sep 2015
|
Draft agenda for the 12th WLTP informal group session
|
WLTP-12-02/Rev.1
|
2015-09-17 |
|
|
17 Sep 2015
|
WLTP informal group open issues table
|
WLTP-12-03
|
2015-09-17 |
|
|
23 Sep 2015
|
GTR No. 15 (WLTP) Phase 1b: Working draft text (Clean version)
|
WLTP-12-04/a
|
2015-09-23 |
|
|
23 Sep 2015
|
GTR No. 15 (WLTP) Phase 1b: Working draft text as of 20 September 2015
|
WLTP-12-04/b
|
2015-09-23 |
|
|
17 Sep 2015
|
GTR No. 15 (WLTP) Phase 1b final draft text of torque-meter related provisions
|
WLTP-12-05
|
2015-09-17 |
Final draft text as prepared by the Torque Meter subgroup and submitted for approval by the WLTP informal working group. |
|
1 Oct 2015
|
GTR No. 15 (WLTP) Phase 1b final draft text of torque-meter related provisions (Revised)
|
WLTP-12-05/Rev.1
|
2015-10-01 |
|
|
17 Sep 2015
|
GTR No. 15 (WLTP) Phase 1b final draft text with regard to on-board anemometry
|
WLTP-12-06
|
2015-09-17 |
Final draft text prepared for review and approval of the WLTP informal working group during its 12th session. |
|
17 Sep 2015
|
GTR No. 15 (WLTP) Phase 1b final draft text concerning the road load family matrix
|
WLTP-12-07
|
2015-09-17 |
Final draft text prepared for review and approval by the WLTP informal working group during its 12th session. |
|
1 Oct 2015
|
GTR No. 15 (WLTP) Phase 1b: Final draft text concerning the road load family matrix (Revised)
|
WLTP-12-07/Rev.1
|
2015-10-01 |
|
|
18 Sep 2015
|
WLTP presentation: Result Postprocessing Proposal (BMW)
|
WLTP-12-08
|
2015-09-18 |
BMW |
|
25 Sep 2015
|
WLTP presentation: Result Postprocessing Proposal (Revised) (BMW)
|
WLTP-12-08/Rev.1
|
2015-09-25 |
Starting note for discussion of test procedure post-processing of results. BMW |
|
18 Sep 2015
|
WLTP Result Postprocessing Proposal (BMW)
|
WLTP-12-09
|
2015-09-18 |
BMW |
|
25 Sep 2015
|
WLTP Result Postprocessing Proposal (Revised) (BMW)
|
WLTP-12-09/Rev.1
|
2015-09-25 |
BMW |
|
18 Sep 2015
|
WLTP result postprocessing tool (BMW)
|
WLTP-12-10
|
2015-09-18 |
BMW |
|
25 Sep 2015
|
WLTP result postprocessing tool (Revised) (BMW)
|
WLTP-12-10/Rev.1
|
2015-09-25 |
BMW |
|
21 Sep 2015
|
GTR No. 15 (WLTP) Phase 1b: Proposal for definitions
|
WLTP-12-11
|
2015-09-21 |
Bill Coleman proposals to improve the definitions section of the draft amendments to GTR No. 15. |
|
21 Sep 2015
|
GTR No. 15 (WLTP) Phase 1b: Proposal for particle definitions
|
WLTP-12-12
|
2015-09-21 |
Bill Coleman proposal, following discussions with other members of the WLTP informal group, to improve the draft GTR No. 15 amendment text with regard to definitions of particles, particle numbers, and particulate matter. |
|
25 Sep 2015
|
GTR No. 15 (WLTP) Phase 1b review of open and closed drafting issues
|
WLTP-12-13
|
2015-09-25 |
Extensive review of the issues raised during the drafting subgroup deliberations and their current resolution status. |
|
25 Sep 2015
|
GTR No. 15 (WLTP) Phase 1b: Wind tunnel method and chassis dyno prescriptions (revision 2) (BMW, UTAC, and VW)
|
WLTP-12-14
|
2015-09-25 |
BMW UTAC VW |
|
25 Sep 2015
|
GTR No. 15 (WLTP) Phase 1b: Progress report of the task force on minimizing the number of tests
|
WLTP-12-15
|
2015-09-25 |
|
|
25 Sep 2015
|
GTR No. 15 (WLTP) Phase 1b: Draft GTR text concerning the number of tests
|
WLTP-12-16
|
2015-09-25 |
|
|
29 Sep 2015
|
GTR No. 15 (WLTP) Phase 1b: Draft GTR text concerning the number of tests
|
WLTP-12-16/Rev.2
|
2015-09-29 |
|
|
25 Sep 2015
|
GTR No. 15 (WLTP) Phase 1b: Status report on the resolution of gearshift open issues
|
WLTP-12-17
|
2015-09-25 |
|
|
1 Oct 2015
|
GTR No. 15 (WLTP) Phase 1b: Status report on the resolution of gearshift open issues (Revised)
|
WLTP-12-17/Rev.1
|
2015-10-01 |
|
|
25 Sep 2015
|
GTR No. 15 (WLTP) Phase 1b: Report on the status of GTR text drafting issues
|
WLTP-12-18
|
2015-09-25 |
|
|
25 Sep 2015
|
GTR No. 15 (WLTP) Phase 1b: Status report on the testing of electric vehicles
|
WLTP-12-19
|
2015-09-25 |
|
|
14 Oct 2015
|
GTR No. 15 (WLTP) Phase 1b: Status report on the testing of electric vehicles (revised)
|
WLTP-12-19/Rev.1
|
2015-10-14 |
|
|
25 Sep 2015
|
GTR No. 15 (WLTP) Phase 1b: Final review of GTR definitions
|
WLTP-12-20
|
2015-09-25 |
|
|
25 Sep 2015
|
GTR No. 15 (WLTP) Phase 1b: Final draft GTR text concerning the wind tunnel method
|
WLTP-12-21
|
2015-09-25 |
|
|
25 Sep 2015
|
GTR No. 15 (WLTP) Phase 1b: Status report on control of additional pollutants (JRC)
|
WLTP-12-22
|
2015-09-25 |
JRC |
|
28 Sep 2015
|
GTR No. 15 (WLTP) Phase 1b: Proposal for control of additional pollutants
|
WLTP-12-23
|
2015-09-28 |
Additional Pollutants: Estimation of oxygenated hydro-carbon (OHC) emissions by using scaling factors between OHC and NMHC for ethanol-blended fuels up to E25. |
|
28 Sep 2015
|
GTR No. 15 (WLTP) Phase 1b: Road Load Matrix Family (RDW and ACEA)
|
WLTP-12-24
|
2015-09-28 |
RDW ACEA |
|
28 Sep 2015
|
GTR No. 15 (WLTP) Phase 1b: Progress report on Annex 4 road load determination
|
WLTP-12-25
|
2015-09-28 |
|
|
28 Sep 2015
|
GTR No. 15 (WLTP) Phase 1b: Review of tolerances under Annex 4 (BMW and TNO)
|
WLTP-12-26
|
2015-09-28 |
BMW TNO |
|
29 Sep 2015
|
GTR No. 15 (WLTP) Phase 1b: Proposal for “Speed Trace Violations/Drive Trace Index”
|
WLTP-12-27
|
2015-09-29 |
Final proposal for consideration to adopt by the WLTP informal group from the Trace Index Task Force. |
|
29 Sep 2015
|
Draft agenda for the 5th WLTP Drafting subgroup session
|
WLTP-12-28
|
2015-09-29 |
|
|
1 Oct 2015
|
WLTP: Study on Evaluation Criteria of Road Load Tolerance in Korea (KATRI)
|
WLTP-12-29/Rev.1
|
2015-10-01 |
KATRI |
|
1 Oct 2015
|
GTR No. 15 (WLTP) validation phase 2 presentation (JRC)
|
WLTP-12-30
|
2015-10-01 |
JRC |
|
1 Oct 2015
|
Measurement of ethanol, formaldehyde and acetaldehyde from a flex-fuel vehicle exhaust over the WLTC (AVL, JRC, and Horiba)
|
WLTP-12-31
|
2015-10-01 |
AVL JRC Horiba |
|
15 Oct 2015
|
GTR No. 15 (WLTP): Interim results of the Asian round-robin validation testing (Japan)
|
WLTP-12-32
|
2015-10-15 |
Presentation on results from the use of the WLTP Phase 1a test protocols across various Contracting Parties in Asia. Japan |
|
15 Oct 2015
|
Minutes of the 12th WLTP informal working group session
|
WLTP-12-33
|
2015-10-15 |
|
|
30 Dec 2015
|
Invitation to the 13th WLTP informal group session
|
WLTP-13-01
|
2015-12-30 |
|
|
30 Dec 2015
|
Draft agenda for the 13th WLTP informal group session
|
WLTP-13-02
|
2015-12-30 |
|
|
30 Dec 2015
|
Open issues table for the 13th WLTP informal group session
|
WLTP-13-03
|
2015-12-30 |
|
|
30 Dec 2015
|
Summary of the remaining issues for phase 1b in the development of GTR No. 15
|
WLTP-13-04
|
2015-12-30 |
Summary of open issues, including items identified following the 12th WLTP informal group session, to be resolved towards finalizing the first phase development of the GTR on light vehicle emissions. |
|
30 Dec 2015
|
Amendments to the formal GRPE proposal of amendments to GTR No. 15 (OICA)
|
WLTP-13-05
|
2015-12-30 |
Draft informal document for eventual submission to the 72nd GRPE session (January 2016) containing final touches to the formal proposal (GRPE/2016/3) for the phase 1b amendments to the GTR on light vehicle emissions. OICA |
|
30 Dec 2015
|
Appendix to the draft proposal for amendments to the formal proposal for phase 1b of GTR No. 15 (OICA)
|
WLTP-13-05/App.1
|
2015-12-30 |
Consolidated proposal for the phase 1b amendments to GTR No. 15 including the changes presented in document WLTP-13-05 (marked up for easy reference). OICA |
|
30 Dec 2015
|
Proposed organization for the Phase 2 development of GTR No. 15
|
WLTP-13-08
|
2015-12-30 |
Proposed Phase 2 organisation including structure for leading team and taskforces. |
|
30 Dec 2015
|
GTR No. 15 (WLTP) Phase 2: Work items and schedule
|
WLTP-13-09
|
2015-12-30 |
Project plan for the development of additional light-vehicle emissions test procedures for presentation to GRPE in January 2019. Phase 2 is expected to address test cycles (gear shift, normalization, and driving index), evaporative emissions, OBD, durability, and in-use compliance as well as supplemental tests for high altitude, severe cold, mobile air-conditioning, idling and crankcase emissions, and "eco-innovation". |
|
30 Dec 2015
|
GTR No. 15 (WLTP) Phase 2: Further consideration of work items (Japan)
|
WLTP-13-10
|
2015-12-30 |
Proposal from Japan to clarify the specific objectives and intentions behind the list of supplemental test procedures developed for Phase 2 of GTR No. 15. Japan |