|
21 May 2012
|
Draft Status Report of the BioRID TEG (BASt)
|
GRSP-51-22
|
2012-05-21 |
Report of the technical evaluation group working on harmonization of the BioRID rear impact dummy in relation to enhancements to GTR 7 on head restraints. BASt |
|
4 Jun 2012
|
Draft Status Report of the BioRID TEG (BASt)
|
GTR7-09-09
|
2012-06-04 |
Draft report on the activities of the technical evaluation group developing certification procedures for the BioRID II dummy. BASt |
|
13 Apr 2012
|
Proposal to modify the GTR 9 bumper test area (BASt)
|
GTR9-02-03
|
2012-04-13 |
Proposal for a modification of the bumper test area for the 'lower and upper legform to bumper' tests. BASt |
|
13 Apr 2012
|
Robustness of SN02 prototype test results (BASt)
|
GTR9-02-04
|
2012-04-13 |
Information concerning the durability of the Flex-GTR SN02 prototype pursuant to tests conducted at BASt. BASt |
|
13 Apr 2012
|
Comparison of Filter Classes for FlexPLI (BASt)
|
GTR9-02-05
|
2012-04-13 |
BASt presentation on comparsion tests between channel frequency classes CFC 180 and CFC 600 for different test setups in order to understand whether the application of different filter classes could have an influence on the FlexPLI test results. BASt |
|
21 Jun 2012
|
Robustness of FlexPLI SN04 prototype: test results (BASt)
|
GTR9-03-05
|
2012-06-21 |
Presentation of the results of 14 inverse certification tests carried out with the FlexPLI test tool SN04 at BASt. BASt |
|
21 Jun 2012
|
BASt draft future work plan for FlexPLI testing (BASt)
|
GTR9-03-06
|
2012-06-21 |
BASt |
|
24 Sep 2012
|
Comparison of Flex-PLI Performance in Vehicle Tests (BASt)
|
GTR9-04-14
|
2012-09-24 |
Presentation overviewing BASt tests carried out on Flex-PLI prototype and series production legform impactors. BASt |
|
24 Sep 2012
|
Pedestrian Lower Extremity Injury Risk (BASt)
|
GTR9-04-16
|
2012-09-24 |
Presentation on German accident data for pedestrian injuries. BASt |
|
24 Sep 2012
|
Pedestrian Lower Extremity Injury Risk (Revision 1) (BASt)
|
GTR9-04-16/Rev.1
|
2012-09-24 |
Revised presentation of German motor-vehicle accident data concerning pedestrian injuries. BASt |
|
24 Sep 2012
|
Flex PLI vs. EEVC WG 17 PLI Benefit Estimation (BASt)
|
GTR9-04-18
|
2012-09-24 |
Comparison of the Flex PLI and the European Enhanced Vehicle Safety Committee legform impactors. BASt |
|
29 Nov 2012
|
Flex-PLI round robin: Checklist for vehicle testing (BASt)
|
GTR9-04-22
|
2012-11-29 |
Pedestrian safety Flex-PLI dynamic test instructions. BASt |
|
7 Dec 2012
|
Estimation of Cost Reduction due to Introduction of FlexPLI within GTR 9 (BASt)
|
GTR9-05-19
|
2012-12-07 |
German cost-benefit estimation for FlexPLI introduction. BASt |
|
7 Dec 2012
|
FlexPLI prototype limits and application to serial production (BASt)
|
GTR9-05-20
|
2012-12-07 |
Verification of draft FlexPLI prototype impactor limits and their application to FlexPLI serial production level. BASt |
|
16 Nov 2012
|
BASt comparative test: glass panes vs. polycarbonate panes (BGS and BASt)
|
IGPG-05-07
|
2012-11-16 |
BGS BASt |
|
18 Apr 2012
|
Pole Side Impact Accidents in Germany (BASt)
|
PSI-05-04
|
2012-04-18 |
Bundesanstalt für Straßenwesen (BaST) presentation of German In-Depth data analysis (GIDAS). BASt |
|
25 May 2012
|
BASt/BGS comments on Humanetics TF-RUCC Flex-PLI presentation (BASt and BGS)
|
TF-RUCC-01-05
|
2012-05-25 |
BASt BGS |
|
25 May 2012
|
BASt/BGS comments on Humanetics TF-RUCC Flex-PLI presentation: Revised (BASt and BGS)
|
TF-RUCC-01-05/Rev.1
|
2012-05-25 |
BASt BGS |