Worldwide Harmonized Light Vehicles Emissions Test Procedure
← WLTP 11
WLTP 13 →
28 Sep-2 Oct 2015  · Tokyo
Agenda All Documents Formal Informal
17 Sep 2015 WLTP-12-02/Rev.1 Draft agenda for the 12th WLTP informal group session
23 Sep 2015 WLTP-12-04/a GTR No. 15 (WLTP) Phase 1b: Working draft text (Clean version)
19 Jun 2015 WLTP-12-01 Invitation to the 12th session of the WLTP informal working group
19 Jun 2015 WLTP-12-01/Att.1 Attachment to the WLTP-12 invitation: Directions to the office of JASIC
19 Jun 2015 WLTP-12-01/Att.2 Attachment to the WLTP-12 invitation: Tokyo Hotel Accommodations
19 Jun 2015 WLTP-12-01/Att.3 Attachment to the WLTP-12 invitation: Tokyo Metro Subway Map
19 Jun 2015 WLTP-12-01/Att.4 Attachment to the WLTP-12 invitation: Suica-Pasmo Card Tokyo network
17 Sep 2015 WLTP-12-03 WLTP informal group open issues table
23 Sep 2015 WLTP-12-04/b GTR No. 15 (WLTP) Phase 1b: Working draft text as of 20 September 2015
17 Sep 2015 WLTP-12-05 GTR No. 15 (WLTP) Phase 1b final draft text of torque-meter related provisions
1 Oct 2015 WLTP-12-05/Rev.1 GTR No. 15 (WLTP) Phase 1b final draft text of torque-meter related provisions (Revised)
17 Sep 2015 WLTP-12-06 GTR No. 15 (WLTP) Phase 1b final draft text with regard to on-board anemometry
17 Sep 2015 WLTP-12-07 GTR No. 15 (WLTP) Phase 1b final draft text concerning the road load family matrix
1 Oct 2015 WLTP-12-07/Rev.1 GTR No. 15 (WLTP) Phase 1b: Final draft text concerning the road load family matrix (Revised)
18 Sep 2015 WLTP-12-08 WLTP presentation: Result Postprocessing Proposal (BMW)
25 Sep 2015 WLTP-12-08/Rev.1 WLTP presentation: Result Postprocessing Proposal (Revised) (BMW)
18 Sep 2015 WLTP-12-09 WLTP Result Postprocessing Proposal (BMW)
25 Sep 2015 WLTP-12-09/Rev.1 WLTP Result Postprocessing Proposal (Revised) (BMW)
18 Sep 2015 WLTP-12-10 WLTP result postprocessing tool (BMW)
25 Sep 2015 WLTP-12-10/Rev.1 WLTP result postprocessing tool (Revised) (BMW)
21 Sep 2015 WLTP-12-11 GTR No. 15 (WLTP) Phase 1b: Proposal for definitions
21 Sep 2015 WLTP-12-12 GTR No. 15 (WLTP) Phase 1b: Proposal for particle definitions
25 Sep 2015 WLTP-12-13 GTR No. 15 (WLTP) Phase 1b review of open and closed drafting issues
25 Sep 2015 WLTP-12-14 GTR No. 15 (WLTP) Phase 1b: Wind tunnel method and chassis dyno prescriptions (revision 2) (BMW, UTAC, and VW)
25 Sep 2015 WLTP-12-15 GTR No. 15 (WLTP) Phase 1b: Progress report of the task force on minimizing the number of tests
25 Sep 2015 WLTP-12-16 GTR No. 15 (WLTP) Phase 1b: Draft GTR text concerning the number of tests
29 Sep 2015 WLTP-12-16/Rev.2 GTR No. 15 (WLTP) Phase 1b: Draft GTR text concerning the number of tests
25 Sep 2015 WLTP-12-17 GTR No. 15 (WLTP) Phase 1b: Status report on the resolution of gearshift open issues
1 Oct 2015 WLTP-12-17/Rev.1 GTR No. 15 (WLTP) Phase 1b: Status report on the resolution of gearshift open issues (Revised)
25 Sep 2015 WLTP-12-18 GTR No. 15 (WLTP) Phase 1b: Report on the status of GTR text drafting issues
25 Sep 2015 WLTP-12-19 GTR No. 15 (WLTP) Phase 1b: Status report on the testing of electric vehicles
14 Oct 2015 WLTP-12-19/Rev.1 GTR No. 15 (WLTP) Phase 1b: Status report on the testing of electric vehicles (revised)
25 Sep 2015 WLTP-12-20 GTR No. 15 (WLTP) Phase 1b: Final review of GTR definitions
25 Sep 2015 WLTP-12-21 GTR No. 15 (WLTP) Phase 1b: Final draft GTR text concerning the wind tunnel method
25 Sep 2015 WLTP-12-22 GTR No. 15 (WLTP) Phase 1b: Status report on control of additional pollutants (JRC)
28 Sep 2015 WLTP-12-23 GTR No. 15 (WLTP) Phase 1b: Proposal for control of additional pollutants
28 Sep 2015 WLTP-12-24 GTR No. 15 (WLTP) Phase 1b: Road Load Matrix Family (RDW and ACEA)
28 Sep 2015 WLTP-12-25 GTR No. 15 (WLTP) Phase 1b: Progress report on Annex 4 road load determination
28 Sep 2015 WLTP-12-26 GTR No. 15 (WLTP) Phase 1b: Review of tolerances under Annex 4 (BMW and TNO)
29 Sep 2015 WLTP-12-27 GTR No. 15 (WLTP) Phase 1b: Proposal for “Speed Trace Violations/Drive Trace Index”
29 Sep 2015 WLTP-12-28 Draft agenda for the 5th WLTP Drafting subgroup session
1 Oct 2015 WLTP-12-29/Rev.1 WLTP: Study on Evaluation Criteria of Road Load Tolerance in Korea (KATRI)
1 Oct 2015 WLTP-12-30 GTR No. 15 (WLTP) validation phase 2 presentation (JRC)
1 Oct 2015 WLTP-12-31 Measurement of ethanol, formaldehyde and acetaldehyde from a flex-fuel vehicle exhaust over the WLTC (AVL, JRC, and Horiba)
15 Oct 2015 WLTP-12-32 GTR No. 15 (WLTP): Interim results of the Asian round-robin validation testing (Japan)
15 Oct 2015 WLTP-12-33 Minutes of the 12th WLTP informal working group session