19 Jun 2015
|
Invitation to the 12th session of the WLTP informal working group
|
WLTP-12-01
|
2015-06-19 |
19 Jun 2015
|
Attachment to the WLTP-12 invitation: Directions to the office of JASIC
|
WLTP-12-01/Att.1
|
2015-06-19 |
19 Jun 2015
|
Attachment to the WLTP-12 invitation: Tokyo Hotel Accommodations
|
WLTP-12-01/Att.2
|
2015-06-19 |
19 Jun 2015
|
Attachment to the WLTP-12 invitation: Tokyo Metro Subway Map
|
WLTP-12-01/Att.3
|
2015-06-19 |
19 Jun 2015
|
Attachment to the WLTP-12 invitation: Suica-Pasmo Card Tokyo network
|
WLTP-12-01/Att.4
|
2015-06-19 |
17 Sep 2015
|
Draft agenda for the 12th WLTP informal group session
|
WLTP-12-02/Rev.1
|
2015-09-17 |
17 Sep 2015
|
WLTP informal group open issues table
|
WLTP-12-03
|
2015-09-17 |
23 Sep 2015
|
GTR No. 15 (WLTP) Phase 1b: Working draft text (Clean version)
|
WLTP-12-04/a
|
2015-09-23 |
23 Sep 2015
|
GTR No. 15 (WLTP) Phase 1b: Working draft text as of 20 September 2015
|
WLTP-12-04/b
|
2015-09-23 |
17 Sep 2015
|
GTR No. 15 (WLTP) Phase 1b final draft text of torque-meter related provisions
|
WLTP-12-05
|
2015-09-17 |
1 Oct 2015
|
GTR No. 15 (WLTP) Phase 1b final draft text of torque-meter related provisions (Revised)
|
WLTP-12-05/Rev.1
|
2015-10-01 |
17 Sep 2015
|
GTR No. 15 (WLTP) Phase 1b final draft text with regard to on-board anemometry
|
WLTP-12-06
|
2015-09-17 |
17 Sep 2015
|
GTR No. 15 (WLTP) Phase 1b final draft text concerning the road load family matrix
|
WLTP-12-07
|
2015-09-17 |
1 Oct 2015
|
GTR No. 15 (WLTP) Phase 1b: Final draft text concerning the road load family matrix (Revised)
|
WLTP-12-07/Rev.1
|
2015-10-01 |
18 Sep 2015
|
WLTP presentation: Result Postprocessing Proposal (BMW)
|
WLTP-12-08
|
2015-09-18 |
25 Sep 2015
|
WLTP presentation: Result Postprocessing Proposal (Revised) (BMW)
|
WLTP-12-08/Rev.1
|
2015-09-25 |
18 Sep 2015
|
WLTP Result Postprocessing Proposal (BMW)
|
WLTP-12-09
|
2015-09-18 |
25 Sep 2015
|
WLTP Result Postprocessing Proposal (Revised) (BMW)
|
WLTP-12-09/Rev.1
|
2015-09-25 |
18 Sep 2015
|
WLTP result postprocessing tool (BMW)
|
WLTP-12-10
|
2015-09-18 |
25 Sep 2015
|
WLTP result postprocessing tool (Revised) (BMW)
|
WLTP-12-10/Rev.1
|
2015-09-25 |
21 Sep 2015
|
GTR No. 15 (WLTP) Phase 1b: Proposal for definitions
|
WLTP-12-11
|
2015-09-21 |
21 Sep 2015
|
GTR No. 15 (WLTP) Phase 1b: Proposal for particle definitions
|
WLTP-12-12
|
2015-09-21 |
25 Sep 2015
|
GTR No. 15 (WLTP) Phase 1b review of open and closed drafting issues
|
WLTP-12-13
|
2015-09-25 |
25 Sep 2015
|
GTR No. 15 (WLTP) Phase 1b: Wind tunnel method and chassis dyno prescriptions (revision 2) (BMW, UTAC, and VW)
|
WLTP-12-14
|
2015-09-25 |
25 Sep 2015
|
GTR No. 15 (WLTP) Phase 1b: Progress report of the task force on minimizing the number of tests
|
WLTP-12-15
|
2015-09-25 |
25 Sep 2015
|
GTR No. 15 (WLTP) Phase 1b: Draft GTR text concerning the number of tests
|
WLTP-12-16
|
2015-09-25 |
29 Sep 2015
|
GTR No. 15 (WLTP) Phase 1b: Draft GTR text concerning the number of tests
|
WLTP-12-16/Rev.2
|
2015-09-29 |
25 Sep 2015
|
GTR No. 15 (WLTP) Phase 1b: Status report on the resolution of gearshift open issues
|
WLTP-12-17
|
2015-09-25 |
1 Oct 2015
|
GTR No. 15 (WLTP) Phase 1b: Status report on the resolution of gearshift open issues (Revised)
|
WLTP-12-17/Rev.1
|
2015-10-01 |
25 Sep 2015
|
GTR No. 15 (WLTP) Phase 1b: Report on the status of GTR text drafting issues
|
WLTP-12-18
|
2015-09-25 |
25 Sep 2015
|
GTR No. 15 (WLTP) Phase 1b: Status report on the testing of electric vehicles
|
WLTP-12-19
|
2015-09-25 |
14 Oct 2015
|
GTR No. 15 (WLTP) Phase 1b: Status report on the testing of electric vehicles (revised)
|
WLTP-12-19/Rev.1
|
2015-10-14 |
25 Sep 2015
|
GTR No. 15 (WLTP) Phase 1b: Final review of GTR definitions
|
WLTP-12-20
|
2015-09-25 |
25 Sep 2015
|
GTR No. 15 (WLTP) Phase 1b: Final draft GTR text concerning the wind tunnel method
|
WLTP-12-21
|
2015-09-25 |
25 Sep 2015
|
GTR No. 15 (WLTP) Phase 1b: Status report on control of additional pollutants (JRC)
|
WLTP-12-22
|
2015-09-25 |
28 Sep 2015
|
GTR No. 15 (WLTP) Phase 1b: Proposal for control of additional pollutants
|
WLTP-12-23
|
2015-09-28 |
28 Sep 2015
|
GTR No. 15 (WLTP) Phase 1b: Road Load Matrix Family (RDW and ACEA)
|
WLTP-12-24
|
2015-09-28 |
28 Sep 2015
|
GTR No. 15 (WLTP) Phase 1b: Progress report on Annex 4 road load determination
|
WLTP-12-25
|
2015-09-28 |
28 Sep 2015
|
GTR No. 15 (WLTP) Phase 1b: Review of tolerances under Annex 4 (BMW and TNO)
|
WLTP-12-26
|
2015-09-28 |
29 Sep 2015
|
GTR No. 15 (WLTP) Phase 1b: Proposal for “Speed Trace Violations/Drive Trace Index”
|
WLTP-12-27
|
2015-09-29 |
29 Sep 2015
|
Draft agenda for the 5th WLTP Drafting subgroup session
|
WLTP-12-28
|
2015-09-29 |
1 Oct 2015
|
WLTP: Study on Evaluation Criteria of Road Load Tolerance in Korea (KATRI)
|
WLTP-12-29/Rev.1
|
2015-10-01 |
1 Oct 2015
|
GTR No. 15 (WLTP) validation phase 2 presentation (JRC)
|
WLTP-12-30
|
2015-10-01 |
1 Oct 2015
|
Measurement of ethanol, formaldehyde and acetaldehyde from a flex-fuel vehicle exhaust over the WLTC (AVL, JRC, and Horiba)
|
WLTP-12-31
|
2015-10-01 |
15 Oct 2015
|
GTR No. 15 (WLTP): Interim results of the Asian round-robin validation testing (Japan)
|
WLTP-12-32
|
2015-10-15 |
15 Oct 2015
|
Minutes of the 12th WLTP informal working group session
|
WLTP-12-33
|
2015-10-15 |