UN R117: Update on measurement uncertainties reduction efforts

ETRTO measurement uncertainties reduction efforts for UN R117 rolling sound emission test methods are progressing through outdoor and indoor Round Robin tests. Eight of thirteen outdoor test centres have completed tests for C1 and C2 tyres; remaining centres anticipate completion by mid-year. Indoors, two of six ETRTO test centres completed tests with others expected finished by mid-year. An intermediate report with available data will be presented in September 2026, full results postponed to February 2027, and the Working Document with test method evolution now expected in September 2027 instead of February 2027.

UNECE server
Excerpts from session reports
GRBP | Session 83 | 10-13 Feb

26. The representative of ETRTO introduced GRBP-83-25. The representative of ISO asked if more technical information was available on the texture of the indoor drum. The representative of ETRTO noted the request and said he would consult internally about the availability of such information.