Show admin view
GTR 7: Draft 9th progress report of the informal group on Phase 2
Document GRSP-65-31
15 May 2019
Submitted by Japan
Download document
Previous Documents, Discussions, and Outcomes
2. | UN Global Technical Regulation No. 7 (Head restraints)

4. The expert from Germany introduced GRSP-65-32, to present the proposed Amendment 2 (GRSP-65-24 superseding ECE/TRANS/WP.29/GRSP/2019/5) to UN GTR No. 7 (Phase 2 of the UN GTR on head restraints), jointly prepared with the experts from Japan and the Netherlands. He explained that the proposal has removed several square brackets and therefore solving the main issues. He added that the draft amendment would introduce: (a) injury criteria focusing on Neck Injury Criteria (NIC) namely upper and lower neck flexion and extension, (b) BioRID as an option for contracting parties to Hybrid III still and © procedure for establishing the height of the head restraint based on the head contact rather than at its absolute height. He clarified that the proposal that would need still some changes, will be complemented by a proposal of Addendum 1 to the Mutual Resolution No. 1 to insert drawings and specifications of the BioRID, to be presented at the December 2019 session of GRSP. Moreover, the experts from France and Russian Federation announced that they would not need the translation of the BioRID manual or other dummy specification and can be dealt with in English only. GRSP noted that all these specifications, when they would be submitted, shall need a disclaimer letter from the dummy manufacturer concerning copyright claims and that they might be upload on the M.R.1 website without any copyright infringements.

5. [At] the same time, the expert from Japan introduced the ninth status report of the Informal Working Group (IWG) on Head Restraints (GRSP-65-31). The expert from CLEPA withdrew ECE/TRANS/WP.29/GRSP/2019/8 and introduced GRSP-65-30 superseding ECE/TRANS/WP.29/GRSP/2019/10 amending the static options of the proposal.

6. Finally, GRSP experts were invited to provide comments to GRSP-65-24 to the expert from Japan by 13 September 2019. Moreover, GRSP requested the secretariat to distribute GRSP-65-30 and GRSP-65-31 with an official symbol and agreed to seek consent of WP.29 and AC.3 to extend the mandate of the IWG until June 2020.

Relates to GTR No. 7 |