previous meeting next meeting
Leverkusen
(Latest 17 May 2012)
Agenda
28 November 2011 Draft agenda of the 3rd IGPG session
IGPG-03-01
IGPG-03-01 2011-11-28
28 November 2011 Car wash round robin test procedure (Bayer)
IGPG-03-02
IGPG-03-02 2011-11-28
28 November 2011 Haze measurements of PC front windows of German police cars (KRD)
IGPG-03-03
IGPG-03-03 2011-11-28
28 November 2011 Possible reason for abnormal haze in round robin test (Taber)
IGPG-03-04
IGPG-03-04 2011-11-28
28 November 2011 Taber round robin: Results of the calibration verification (Taber)
IGPG-03-05
IGPG-03-05 2011-11-28
28 November 2011 Taber round robin: Verification of Taber instruments used (Taber)
IGPG-03-06
IGPG-03-06 2011-11-28
28 November 2011 Possible sources of variation found in the Taber round robin (Taber)
IGPG-03-07
IGPG-03-07 2011-11-28
28 November 2011 Results of Ball followed by humidity test (Vinçotte)
IGPG-03-08
IGPG-03-08 2011-11-28
28 November 2011 Results of ageing followed by abrasion test (Vinçotte)
IGPG-03-09
IGPG-03-09 2011-11-28
1 December 2011 Car wash round robin test for plastic glazing (Bayer)
IGPG-03-10
IGPG-03-10 2011-12-01
1 December 2011 Taber round robin test analysis (Bayer)
IGPG-03-11
IGPG-03-11 2011-12-01
1 December 2011 PC Cutting Trials done by German Fire and Rescue Service (initiated by VDA) (Bayer)
IGPG-03-12
IGPG-03-12 2011-12-01
1 December 2011 Round robin sand-drop test: Results and analysis (MPA NRW)
IGPG-03-13
IGPG-03-13 2011-12-01
1 December 2011 Comparative Tests with Laminated Safety Glass Panes and Polycarbonate Panes (BASt)
IGPG-03-14
IGPG-03-14 2011-12-01
1 December 2011 Draft report of the 3rd IGPG meeting
IGPG-03-15
IGPG-03-15 2011-12-01
17 May 2012 Revised minutes of the 3rd IGPG session
IGPG-03-15/Rev.1
IGPG-03-15/Rev.1 2012-05-17