Proposal to increase the potential speed reduction during the collision warning phase and clarify the interpretation of “engine start/run cycle”.
AC.3
Select Year
GRB
GRBP
GRE
GRPE
GRRF
GRSG
GRSP
GRVA
WP.29
13. Mr. Mark Polster showed a comparison of measurement results of the different existing standards. He specifically indicated that changes in the measurement temperature, windows opening and soak time can have influence on the results.