| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 |
|---|---|---|---|---|---|---|---|---|---|
| Document Title | PMP issues summary presentation | ||||||||
| Reference Number | PMP-35-09 | ||||||||
| Date |
4 Mar 2015
|
||||||||
| Summary | NRMM: Raw exhaust (tailpipe) sampling, WLTP comments Calibration of PN systems: Calibration topics overview, PNC, VPR Sub23nm measurements: Catalytic stripper: Losses,and PCRF VPR vs CS: Catalytic stripper: Measurements, Sub 23nm: Error estimation Regeneration: robustness Summary / Next steps | ||||||||
| Source(s) | JRC | ||||||||
| Rulemaking Area(s) | PMP | ||||||||
| Meeting(s) | |||||||||
| Related Documents | |||||||||
| PMP-35-13 | PMP issues summary presentation: updated | ||||||||
| Downloads | |||||||||
| UNECE server | .ppt format | ||||||||