PMP-30-04
PMP: Volatile Particle Remover calibration issues
Source(s)
JRC
Date
3 Apr 2014
Status
Subject
Meeting(s)
UNECE server
Excerpts from session reports
PMP | Session 30 | 3-4 Apr 2014

The VPR calibration report is currently unchanged – the recommendations from JRC were added to the report as comments .

The CPC calibration document is also unchanged.

Both documents to be uploaded to PMP website with request for comments.

Agreed – only to consider updates in relation to 23nm at the present time. A further update to 10nm would be made when more information is available.

Next meeting – BERN GPF presentation