GTR No. 13
← GTR No. 12
GTR No. 14 →
Texts and Appendices Documents Meetings ← Back
Documents 2019 68 documents
21 Feb 2019 GTR 13: NHTSA final report on Hydrogen Container Performance Testing (NHTSA) GTR13-05-03
8 Mar 2019 GTR 13: Draft proposal for amendments to the scope with comments GTR13-05-04/Rev.2
Intentionally blank
22 Feb 2019 GTR 13: Current status and draft plan for round-robin validation testing (Japan) GTR13-05-06
8 Mar 2019 GTR 13 Phase II general project schedule GTR13-05-08/Rev.1
4 Mar 2019 ISO/TC 197 (hydrogen fuel vehicle interoperability) status update (ISO) GTR13-05-09
4 Mar 2019 GTR 13 Task Force 4: JARI localized fire test (JARI) GTR13-05-10
7 Mar 2019 Task Force 5 ISO/TC 197 Recommendations (hydrogen fueling interoperability) (ISO) GTR13-05-11/Rev.1
4 Mar 2019 H2 Composite Pressure Vessel (CEA) GTR13-05-12
Intentionally blank (HySAFER-Ulster University)
Intentionally blank (HySAFER-Ulster University)
6 Mar 2019 GTR 13 Task Force 1 current status GTR13-05-15/Rev.1
5 Mar 2019 GTR 13: CSA technical committee updates-hydrogen and natural gas standards (CSA) GTR13-05-16
5 Mar 2019 GTR 13 Phase 2: NHTSA Updates (NHTSA) GTR13-05-17
6 Mar 2019 GTR 13: Engulfing and localised tests: further analysis (HySAFER-Ulster University) GTR13-05-20
6 Mar 2019 Comments on GTR 13 informal group documents (BAM) GTR13-05-21
6 Mar 2019 GTR 13: H2 Composite Pressure Vessel (CEA) GTR13-05-22
6 Mar 2019 GTR 13 Task Force 3 (Refueling) test procedures input GTR13-05-23
6 Mar 2019 GTR 13 Task Force 3 refueling points (Air Liquide) GTR13-05-24
7 Mar 2019 GTR 13 materials compatibility proposal GTR13-05-25
7 Mar 2019 GTR 13: H2 Composite Vessel- Additional slide (CEA) GTR13-05-26
7 May 2019 GTR 13 Phase 2 informal group 5th session meeting notes GTR13-05-27
11 Jun 2019 GTR 13: Hydrogen storage conformable tanks and protective shells (Linamar) GTR13-06-03
11 Jun 2019 GTR 13: Proposal for materials hydrogen compatibility (Japan) GTR13-06-04
11 Jun 2019 GTR 13: Rationale for high-pressure hydrogen material compatibility testing (Japan) GTR13-06-05
13 Jun 2019 Current status of round-robin tests for hydrogen material compatibility (Japan) GTR13-06-06
11 Jun 2019 GTR 13: Status of round-robin tests for hydrogen material compatibility (Japan) GTR13-06-06
11 Jun 2019 GTR 13: Necessity of HG-SCC test methodfor aluminum alloys (Japan) GTR13-06-07
12 Jun 2019 GTR 13: Status of Phase 2 issues GTR13-06-08
12 Jun 2019 GTR 13: JAMA comments on Task Force 5 interoperability draft text (JAMA) GTR13-06-09
12 Jun 2019 GTR 13: Draft interoperability provisions with track changes GTR13-06-10
12 Jun 2019 GTR 13: Draft interoperability provisions (clean text) GTR13-06-11
12 Jun 2019 GTR 13: Status of Task Force 4 work on fire testing provisions GTR13-06-12
Removed: "GTR 13: Reducing burst ratio" (CEA)
17 Jun 2019 HFCV Task Force 2 (Receptacles): Proposal for statement of technical rationale and justification GTR13-06-15
17 Jun 2019 ISO TC 197 Hydrogen Technologies Update (ISO) GTR13-06-16
17 Jun 2019 Updates on Fuel Cell Vehicle Standardization in China (CATARC) GTR13-06-17
18 Jun 2019 BAM comments on GTR 13 Phase 2 documents (BAM) GTR13-06-18
18 Jun 2019 GTR 13-Phase 2 Task Force 1 (heavy vehicles) status report GTR13-06-19
18 Jun 2019 GTR 13: Input for permeation provisions in heavy-duty vehicle technical rationale (SAE) GTR13-06-20
18 Jun 2019 GTR 13: Proposal for revised scope text (OICA) GTR13-06-21
18 Jun 2019 GTR 13: Planning Research for Development of Safety Assessment Technology & Test Devices of HFCV Bus (KATRI) GTR13-06-22
18 Jun 2019 GTR 13: Fire test protocol amendments (HySAFER-Ulster University) GTR13-06-23
18 Jun 2019 GTR 13: Burst pressure comparison per Safety Factor change (TK-Fujikin) GTR13-06-24
18 Jun 2019 Current Status for Hydrogen Material Compatibility Tests of Polymers in Korea (KRISS) GTR13-06-25
18 Jun 2019 GTR 13: Comments from Task Force 3 on test procedures GTR13-06-26
19 Jun 2019 GTR 13: Current status of round-robin testing in Korea (KRISS) GTR13-06-27
9 Aug 2019 GTR 13: Updated Phase 2 issues list GTR13-06-28/Rev.2
9 Aug 2019 Minutes of the 6th GTR 13 Phase 2 informal group session GTR13-06-29
21 Aug 2019 General information for the 7th GTR13 Phase II informal group session GTR13-07-01/Rev.2
25 Oct 2019 Necessity of HG-SCC test method for aluminum alloys (Japan) GTR13-07-04
25 Oct 2019 GTR13-Phase 2 informal group open issues GTR13-07-05
25 Oct 2019 Proposals by the GTR13-Phase 2 informal group secretary GTR13-07-06
31 Oct 2019 GTR 13 fire test: Research results and text amendments (HySAFER-Ulster University) GTR13-07-07
31 Oct 2019 Proposed test method to establish hydrogen compatibility of materials for fuel cell vehicles (Sandia) GTR13-07-08
6 Nov 2019 GTR 13: CSA updates (CSA) GTR13-07-09
6 Nov 2019 GTR 13: Material Provisions for HFCV In Regulations or in (industry) Standards (OICA) GTR13-07-10
6 Nov 2019 GTR 13: Phase 2 Task Force 1 proposals GTR13-07-11
25 Nov 2019 Draft Proposal to Improve GTR13 through Development of Safety Assessment Technology & Test Devices of HFC Bus (KATRI) GTR13-07-12/Rev.1
7 Nov 2019 GTR 13: Testing procedures task force (TF3) meeting minutes GTR13-07-13/Rev.1
6 Nov 2019 GTR 13: Receptacles task force (TF2) draft text proposal GTR13-07-14
7 Nov 2019 GTR 13: Burst Strength as Safety Criteria for Type 4 Composite Pressure Vessels (BAM) GTR13-07-15/Rev.1
6 Nov 2019 GTR 13: Fire test definition (Phase 2 informal group task force 4) GTR13-07-16
6 Nov 2019 GTR 13 fire test in “bullet points” (HySAFER-Ulster University) GTR13-07-17
6 Nov 2019 GTR 13: OICA input for sled testing (OICA) GTR13-07-18
6 Nov 2019 GTR 13: Bonfire test burner assessments (CSA and JARI) GTR13-07-19
7 Nov 2019 GTR 13: Status of draft text on Phase 2 test procedures (Task Force 3) GTR13-07-20
7 Nov 2019 GTR 13: Task Force 2 Receptacles proposal for GTR text (BAM) GTR13-07-21