Informal Group on GTR 9-Phase 2
← GTR9 8
Final Documents of the GTR 9-Phase 2 informal group →
16-17 Dec 2013  · Geneva
Agenda All Documents Informal Report
Filtered: GTR No. 9 Pedestrian Safety (GTR) Remove filter
25 Feb 2014 GTR9-04-03/Rev.3 GTR 9-Phase 2: Status of Activity List Items (updated in the 9th meeting, 17 December 2013)
7 Dec 2013 GTR9-09-01 Draft agenda for the 9th GTR 9-Phase 2 informal group session
16 Dec 2013 GTR9-09-01/Rev.1 Final agenda for the 9th GTR 9-Phase 2 informal group session
8 Dec 2017 GTR9-09-02 Minutes of the 9th GTR 9-Phase 2 informal group session
8 Dec 2017 GTR9-09-02 Minutes of the 9th GTR 9-Phase 2 informal group session
7 Dec 2013 GTR9-09-03 FlexPLI weight tolerances: Reduction of proposed weight tolerances (OICA)
16 Dec 2013 GTR9-09-04/Rev.1 Lower Legform Test Area: Justification of the Need for a Relaxation Zone (Revised) (OICA)
7 Dec 2013 GTR9-09-05 Proposal of 01 series of amendments to Regulation No. 127 (Japan)
7 Dec 2013 GTR9-09-06 Proposed amendments of the three-point bending certification test figure in GTR No. 9 (Japan)
12 Dec 2013 GTR9-09-07 FlexPLI GTR User Manual Rev. F (Draft) 2013 (Humanetics)
16 Dec 2013 GTR9-09-07/Rev.1 Flex PLI GTR: User Manual (Humanetics)
12 Dec 2013 GTR9-09-08 Updates to Flex PLI Manual Rev E to Rev F (Humanetics)
16 Dec 2013 GTR9-09-08/Rev.1 Updates to Flex PLI Manual Rev E to Rev F (Humanetics)
12 Dec 2013 GTR9-09-09 Flex PLI: Max and Min Femur Certification Analysis (Humanetics)
12 Dec 2013 GTR9-09-10 Flex PLI Review: Weight Tolerance (Humanetics)
9 Feb 2015 GTR9-09-11/Rev.4 Reviewed FlexPLI version GTR drawing package, Rev. 4 (final version status Feb. 2015) (Humanetics)
21 Feb 2014 GTR9-09-11/Rev.1 Reviewed FlexPLI version GTR drawing package (updated) (Humanetics)
22 May 2014 GTR9-09-11/Rev.2 Reviewed FlexPLI version GTR drawing package, Rev. 2 (final version) (Humanetics)
12 Dec 2013 GTR9-09-12 Details of Drawing Updates to Flex GTR9 Regulation Drawings (Humanetics)
12 Dec 2013 GTR9-09-13 Flex PLI: Flesh Neoprene Corridor (Humanetics)
12 Dec 2013 GTR9-09-14 Flex PLI Review: Dimensional Tolerance (Humanetics)
16 Dec 2013 GTR9-09-15 Change to foam flesh used by EEVC lower & upper legforms (TRL)
16 Dec 2013 GTR9-09-16 Flex PLI Drawing Review (Cellbond)
21 Feb 2014 GTR9-09-17 Legform Tests: Results from Round 2, Flex-PLI (TRL)