Worldwide Harmonized Light Vehicles Emissions Test Procedure (WLTP)
Reports to GRPE
← Back
Documents 2015
151 documents
28 Sep 2015 GTR No. 15 (WLTP) Phase 1b: Proposal for control of additional pollutants WLTP-12-23
28 Sep 2015 GTR No. 15 (WLTP) Phase 1b: Road Load Matrix Family WLTP-12-24
28 Sep 2015 GTR No. 15 (WLTP) Phase 1b: Progress report on Annex 4 road load determination WLTP-12-25
28 Sep 2015 GTR No. 15 (WLTP) Phase 1b: Review of tolerances under Annex 4 WLTP-12-26
29 Sep 2015 GTR No. 15 (WLTP) Phase 1b: Proposal for “Speed Trace Violations/Drive Trace Index” WLTP-12-27
29 Sep 2015 GTR No. 15 (WLTP) Phase 1b: Draft GTR text concerning the number of tests WLTP-12-16/Rev.2
29 Sep 2015 Draft agenda for the 5th WLTP Drafting subgroup session WLTP-12-28
1 Oct 2015 Measurement of ethanol, formaldehyde and acetaldehyde from a flex-fuel vehicle exhaust over the WLTC WLTP-12-31
1 Oct 2015 GTR No. 15 (WLTP) validation phase 2 presentation WLTP-12-30
1 Oct 2015 WLTP: Study on Evaluation Criteria of Road Load Tolerance in Korea WLTP-12-29/Rev.1
1 Oct 2015 GTR No. 15 (WLTP) Phase 1b: Status report on the resolution of gearshift open issues (Revised) WLTP-12-17/Rev.1
1 Oct 2015 GTR No. 15 (WLTP) Phase 1b: Final draft text concerning the road load family matrix (Revised) WLTP-12-07/Rev.1
1 Oct 2015 GTR No. 15 (WLTP) Phase 1b final draft text of torque-meter related provisions (Revised) WLTP-12-05/Rev.1
14 Oct 2015 GTR No. 15 (WLTP) Phase 1b: Status report on the testing of electric vehicles (revised) WLTP-12-19/Rev.1
15 Oct 2015 GTR No. 15 (WLTP): Interim results of the Asian round-robin validation testing WLTP-12-32
15 Oct 2015 Minutes of the 12th WLTP informal working group session WLTP-12-33
30 Dec 2015 Invitation to the 13th WLTP informal group session WLTP-13-01
30 Dec 2015 Draft agenda for the 13th WLTP informal group session WLTP-13-02
30 Dec 2015 Open issues table for the 13th WLTP informal group session WLTP-13-03
30 Dec 2015 Summary of the remaining issues for phase 1b in the development of GTR No. 15 WLTP-13-04
30 Dec 2015 Amendments to the formal GRPE proposal of amendments to GTR No. 15 WLTP-13-05
30 Dec 2015 Appendix to the draft proposal for amendments to the formal proposal for phase 1b of GTR No. 15 WLTP-13-05/App.1
30 Dec 2015 Proposed organization for the Phase 2 development of GTR No. 15 WLTP-13-08
30 Dec 2015 GTR No. 15 (WLTP) Phase 2: Work items and schedule WLTP-13-09
30 Dec 2015 GTR No. 15 (WLTP) Phase 2: Further consideration of work items WLTP-13-10
← Previous Page 6 of 7 Next →