|
6 Sep 2013
|
Draft agenda for the 8th GTR 9-Phase 2 informal group session
|
GTR9-08-01
|
2013-09-06 |
|
10 Sep 2013
|
Final agenda for the 8th GTR 9-Phase 2 informal group session
|
GTR9-08-01/Rev.1
|
2013-09-10 |
|
23 Nov 2013
|
Draft minutes of the 8th GTR 9-Phase II informal group session
|
GTR9-08-02
|
2013-11-23 |
|
16 Dec 2013
|
Final minutes of the 8th session of the GTR9-Phase 2 informal group
|
GTR9-08-02/Rev.1
|
2013-12-16 |
|
6 Sep 2013
|
GTR9 – Draft Working Document of IG GTR9 PH2 (Version 1: 04 Sept. 2013)
|
GTR9-08-03
|
2013-09-06 |
|
12 Sep 2013
|
GTR9 – Draft Working Document of IG GTR9 PH2 (Version 2: 10 Sept. 2013)
|
GTR9-08-03/Rev.1
|
2013-09-12 |
|
6 Sep 2013
|
GTR9 – Draft Preamble of IG GTR9 PH2 (Version 1: 04 Sept. 2013)
|
GTR9-08-04
|
2013-09-06 |
|
6 Sep 2013
|
GTR No. 9 – Draft proposal for Amendment 2
|
GTR9-08-06
|
2013-09-06 |
|
6 Sep 2013
|
Proposed title block for GTR 9 regulation drawings (Humanetics)
|
GTR9-08-07
|
2013-09-06 |
|
6 Sep 2013
|
Comments to JAMA presentation GTR9-7-06c and Proposed Changes, Flex PLI GTR Manual (Humanetics)
|
GTR9-08-08
|
2013-09-06 |
|
30 Jan 2017
|
Revised Comments to JAMA Presentation GTR9-7-06c and Proposed Changes, FlexPLI GTR Manual (Humanetics)
|
GTR9-08-08/Rev.1
|
2017-01-30 |
|
6 Sep 2013
|
Humanetics Comments to Cellbond Flex PLI Drawing Check Document (Humanetics)
|
GTR9-08-09
|
2013-09-06 |
|
6 Sep 2013
|
Humanetics comments to JASIC Flex drawing review (Humanetics)
|
GTR9-08-10
|
2013-09-06 |
|
6 Sep 2013
|
Comparison of Effect of Different Approaches on Injury Risk Functions (JASIC)
|
GTR9-08-11
|
2013-09-06 |
|
10 Sep 2013
|
Possible Influence of Temperature & Humidity on the FlexPLI Behaviour (OICA)
|
GTR9-08-12
|
2013-09-10 |
|
9 Sep 2013
|
FlexPLI Manual: FlexPLI Preparation before Car Testing (OICA)
|
GTR9-08-13
|
2013-09-09 |
|
10 Sep 2013
|
Request for Transitional Provisions for FlexPLI Usage (OICA)
|
GTR9-08-14
|
2013-09-10 |
|
10 Sep 2013
|
FlexPLI Biofidelic Assesment Interval (BAI): Open Issues (BASt)
|
GTR9-08-15
|
2013-09-10 |
|
10 Sep 2013
|
Change to foam flesh used by EEVC lower & upper legforms (TRL)
|
GTR9-08-16
|
2013-09-10 |
|
10 Sep 2013
|
FlexPLI Version GTR Testing of Vehicles with Different Bumper Systems (OICA)
|
GTR9-08-17
|
2013-09-10 |
|
10 Sep 2013
|
Femur Certification Corridors for the Inverse Test (Zero Cross Timing) (JASIC)
|
GTR9-08-18
|
2013-09-10 |
|
10 Sep 2013
|
Femur Certification Corridors for the Pendulum Test (Zero Cross Timing) (JASIC)
|
GTR9-08-19
|
2013-09-10 |