Speaking to agenda item 2, Ms. Marchington reviewed document EVE-09-12e with a focus on action items. Ms. Marchington detailed which action items were completed or ongoing, including:
Speaking to agenda item 2, Ms. Marchington reviewed document EVE-09-12e with a focus on action items. Ms. Marchington detailed which action items were completed or ongoing, including:
Discussion on the new EVE mandate proposal under agenda item 4 was based on informal document GRPE-69-14.
Mr. Olechiw introduced GRPE-69-14 and the purpose of the discussion, which was to discuss continued work by the EVE IWG under a new mandate that would start in November 2014. During the EVE-9 meeting in February, 2014, there was agreement by the EVE group that continued work in a new mandate was desired; the recommendations in the Guide indicate potential future work that could be explored. Prior to the EVE-10 meeting, a new mandate document was drafted and agreed to by Canada, China, Japan, USA (EVE leadership), and it was subsequently distributed to EU and GRPE Chair for comment and submitted informally to the GRPE Secretariat (GRPE-69-14).
During the EVE-10 meeting, comments from parties on GRPE-69-14 were discussed at length; these comments are detailed below, along with the final decision by the EVE leadership on the comments, which resulted in informal document (GRPE-69-14, rev1):
Also, there was agreement that the new EVE group should maintain the current leadership structure. During the EVE-10 meeting, the European Union was unsure if they would like to be a co-sponsor of the work, so the square brackets in the text were maintained.
Finally, Mr. Olechiw reminded the EVE IWG that during the 69th GRPE session later in the week there would be discussion of the informal new EVE mandate proposal (GRPE-69-14, rev1); although formal GRPE approval of the mandate is not required, agreement by the GRPE is desired. The proposal would then be tabled for informal discussion at the June 2014 WP.29 session and formal approval at the November 2014 WP.29 session.
ACTION 2: Pending GRPE approval, the EVE Secretariat will facilitate the submission of the new EVE mandate document as an informal document for the June 2014 WP.29 session and as a formal document for the November 2014 WP.29 session.
Speaking to agenda item 2, Ms. Marchington reviewed document EVE-09-12e with a focus on action items. Ms. Marchington detailed which action items were completed or ongoing, including:
Discussion on the new EVE mandate proposal under agenda item 4 was based on informal document GRPE-69-14.
Mr. Olechiw introduced GRPE-69-14 and the purpose of the discussion, which was to discuss continued work by the EVE IWG under a new mandate that would start in November 2014. During the EVE-9 meeting in February, 2014, there was agreement by the EVE group that continued work in a new mandate was desired; the recommendations in the Guide indicate potential future work that could be explored. Prior to the EVE-10 meeting, a new mandate document was drafted and agreed to by Canada, China, Japan, USA (EVE leadership), and it was subsequently distributed to EU and GRPE Chair for comment and submitted informally to the GRPE Secretariat (GRPE-69-14).
During the EVE-10 meeting, comments from parties on GRPE-69-14 were discussed at length; these comments are detailed below, along with the final decision by the EVE leadership on the comments, which resulted in informal document (GRPE-69-14, rev1):
Also, there was agreement that the new EVE group should maintain the current leadership structure. During the EVE-10 meeting, the European Union was unsure if they would like to be a co-sponsor of the work, so the square brackets in the text were maintained.
Finally, Mr. Olechiw reminded the EVE IWG that during the 69th GRPE session later in the week there would be discussion of the informal new EVE mandate proposal (GRPE-69-14, rev1); although formal GRPE approval of the mandate is not required, agreement by the GRPE is desired. The proposal would then be tabled for informal discussion at the June 2014 WP.29 session and formal approval at the November 2014 WP.29 session.
ACTION 2: Pending GRPE approval, the EVE Secretariat will facilitate the submission of the new EVE mandate document as an informal document for the June 2014 WP.29 session and as a formal document for the November 2014 WP.29 session.
At the time of the EVE-10 meeting, it was unclear if a future EVE meeting would be held, as this requires the approval of a new EVE mandate by AC.3. Therefore, a draft agenda was not discussed. If the new EVE mandate was approved by AC.3 in November 2014, a meeting could be held shortly after; or, pending GRPE agreement with GRPE-69-14, rev1 and advice of the GRPE Chair, the next EVE meeting could be held in the fall.
ACTION 3: The EVE Secretariat will approach the GRPE Chair for advice on timing of the next EVE meeting and inform the EVE group as required.
35. The Chair of the IWG on EVE introduced GRPE-69-26 on recent meetings. He provided information on the draft regulatory reference guide (ECE/TRANS/WP.29/GRPE/2014/13) and recommended its endorsement by GRPE. He reported that several minor changes had been suggested, but that the EVE leadership did not accept them. He presented GRPE-69-14-Rev.1 containing a proposal for a new mandate. GRPE endorsed the proposed Electric Vehicle Reference Guide, which would be submitted to WP.29 for consideration at its November 2014 session. Noting the concern raised by OICA about the wording “assuming that” as well as the position of the EC to be clarified at the June 2014 AC.3 session, GRPE welcomed in principle the proposal for the road map to develop a gtr by the EVE Group.