PMP draft recommendations for <23nm measurements
Document PMP-30-12
4 April 2014
Download document
Previous Documents, Discussions, and Outcomes
4. | Calibration status

The VPR calibration report is currently unchanged – the recommendations from JRC were added to the report as comments .

The CPC calibration document is also unchanged.

Both documents to be uploaded to PMP website with request for comments.

Agreed – only to consider updates in relation to 23nm at the present time. A further update to 10nm would be made when more information is available.

Next meeting – BERN GPF presentation