WP.29/2009/129/Corr.2
UN R64: Proposal for the 02 series of amendments
Source(s)
Date
6 Oct 2009
Status
Adopted by WP.29
Subject
Impact
02 series of amendments
Meeting(s)

Corrigendum to correct Annex 5. Modify para. 1.5. to specify that pressure measurement equipment shall be accurate to at least +/- 3kPa. Modify para. 2.1. to require all pressure measurements be carried out using the same test equipment. Modify paras. 2.5.1. and 2.5.2. to specify procedures for puncture and diffusion tests, including deflation parameters and stabilisation periods. Delete para. 2.5.3.

UNECE server