6 Jan 2011
|
Draft agenda for the 1st Plastic Glazing informal group session
|
IGPG-01-01
|
2011-01-06 |
14 Mar 2011
|
Report of the February 2010 meeting of experts on plastic glazing
|
IGPG-01-02
|
2011-03-14 |
14 Mar 2011
|
Presentation on the state of the art in plastic glazing (Bayer)
|
IGPG-01-03
|
2011-03-14 |
14 Mar 2011
|
Presentation on experiences with automotive plastic glazing (KRD)
|
IGPG-01-04
|
2011-03-14 |
14 Mar 2011
|
Plastic glazing overview (SABIC and Exatec)
|
IGPG-01-05
|
2011-03-14 |
14 Mar 2011
|
Japan comments for the draft agenda of the IGPG session (Japan)
|
IGPG-01-06
|
2011-03-14 |
14 Mar 2011
|
Draft minutes of the 1st IGPG session
|
IGPG-01-07
|
2011-03-14 |
11 Jun 2011
|
Draft agenda of the 2nd IGPG session
|
IGPG-02-01
|
2011-06-11 |
11 Jun 2011
|
Results of the Taber Round Robin test performed within the IGPG (Bayer)
|
IGPG-02-02
|
2011-06-11 |
11 Jun 2011
|
Tables of Taber test results (Taber)
|
IGPG-02-03
|
2011-06-11 |
11 Jun 2011
|
Taber Industries analysis of IGPG Taber Round Robin Results (Taber)
|
IGPG-02-04
|
2011-06-11 |
20 Jun 2011
|
Terms of reference of the informal group on the introduction of plastic glazing into Regulation No. 43
|
IGPG-01-08
|
2011-06-20 |
29 Jun 2011
|
Report of the 1st IGPG meeting: revised
|
IGPG-01-07/Rev.1
|
2011-06-29 |
29 Jun 2011
|
Results of the Taber Round Robin test performed within the IGPG: Revised (Bayer)
|
IGPG-02-02/Rev.1
|
2011-06-29 |
29 Jun 2011
|
Tables of Taber test results: Revised (Taber)
|
IGPG-02-03/Rev.1
|
2011-06-29 |
29 Jun 2011
|
Plastic Glazing - Scratch and Abrasion Tests (Bayer)
|
IGPG-02-05
|
2011-06-29 |
29 Jun 2011
|
Window requirements for forestry machines (Deere)
|
IGPG-02-06
|
2011-06-29 |
29 Jun 2011
|
NSG Group comments on the results of the taber round robin tests (NSG)
|
IGPG-02-07
|
2011-06-29 |
29 Jun 2011
|
Draft report of the 2nd IGPG meeting
|
IGPG-02-08
|
2011-06-29 |
28 Nov 2011
|
Draft agenda of the 3rd IGPG session
|
IGPG-03-01
|
2011-11-28 |
28 Nov 2011
|
Car wash round robin test procedure (Bayer)
|
IGPG-03-02
|
2011-11-28 |
28 Nov 2011
|
Haze measurements of PC front windows of German police cars (KRD)
|
IGPG-03-03
|
2011-11-28 |
28 Nov 2011
|
Possible reason for abnormal haze in round robin test (Taber)
|
IGPG-03-04
|
2011-11-28 |
28 Nov 2011
|
Taber round robin: Results of the calibration verification (Taber)
|
IGPG-03-05
|
2011-11-28 |
28 Nov 2011
|
Possible sources of variation found in the Taber round robin (Taber)
|
IGPG-03-07
|
2011-11-28 |
28 Nov 2011
|
Taber round robin: Verification of Taber instruments used (Taber)
|
IGPG-03-06
|
2011-11-28 |
28 Nov 2011
|
Results of Ball followed by humidity test (Vinçotte)
|
IGPG-03-08
|
2011-11-28 |
28 Nov 2011
|
Results of ageing followed by abrasion test (Vinçotte)
|
IGPG-03-09
|
2011-11-28 |
1 Dec 2011
|
Car wash round robin test for plastic glazing (Bayer)
|
IGPG-03-10
|
2011-12-01 |
1 Dec 2011
|
Taber round robin test analysis (Bayer)
|
IGPG-03-11
|
2011-12-01 |
1 Dec 2011
|
PC Cutting Trials done by German Fire and Rescue Service (initiated by VDA) (Bayer)
|
IGPG-03-12
|
2011-12-01 |
1 Dec 2011
|
Round robin sand-drop test: Results and analysis (MPA NRW)
|
IGPG-03-13
|
2011-12-01 |
1 Dec 2011
|
Comparative Tests with Laminated Safety Glass Panes and Polycarbonate Panes (BASt)
|
IGPG-03-14
|
2011-12-01 |
1 Dec 2011
|
Draft report of the 3rd IGPG meeting
|
IGPG-03-15
|
2011-12-01 |
1 Dec 2011
|
Final report of the 2nd IGPG meeting
|
IGPG-02-08/Rev.1
|
2011-12-01 |