GRE proposal to insert provisions for the use of incandescent light sources in the case of light source modules and lamps with non-replaceable light sources and to update the Conformity of Production (CoP) requirements.
Regarding: |
Meeting(s): |
|
[Proposal returned to GRE for further consideration.]
10. GRE reviewed and unanimously adopted the pending amendment proposals so as to consolidate the existing Regulations before they are frozen and superseded by three new Regulations that are in drafting:
1 | Except for the part which was already adopted by WP.29 as ECE/TRANS/WP.29/2013/75/Rev.1 and Add.1 (note by the secretariat). |
2 | Except for the part which was already adopted by WP.29 as ECE/TRANS/WP.29/2013/90/Rev.1 (note by the secretariat). |
3 | Except for the part which was already adopted by WP.29 as ECE/TRANS/WP.29/2013/92/Rev.1 (note by the secretariat). |
4 | Except for the part which was already adopted by WP.29 as ECE/TRANS/WP.29/2013/93/Rev.1 (note by the secretariat). |
5 | Except for Section B on Regulation No. 45 which was already submitted to WP.29 as ECE/TRANS/WP.29/2016/77 (note by the secretariat). |
21. GRE requested IWG SLR to consider GRE-71-23 and to consolidate into a horizontal document, harmonized definitions in lighting and light-signalling Regulations. For the same purpose, GRE referred to IWG SLR collective proposals, such as compliance obligations with installation requirements, definition of “type” with regard to the manufacturer and trade names/marks and provisions for the conformity of production, including those that had been referred back by WP.29 (ECE/TRANS/WP.29/GRE/2013/55/Rev.1, ECE/TRANS/WP.29/2013/68, ECE/TRANS/ WP.29/2013/69, ECE/TRANS/WP.29/2013/71, ECE/TRANS/WP.29/2013/72, ECE/ TRANS/WP.29/2013/76, ECE/TRANS/WP.29/2013/79, ECE/TRANS/WP.29/2013/83, ECE/TRANS/WP.29/2013/84, ECE/TRANS/WP.29/2013/85, ECE/TRANS/WP.29/ 2013/86, ECE/TRANS/WP.29/2013/87, ECE/TRANS/WP.29/2013/88, ECE/TRANS/ WP.29/2013/89, ECE/TRANS/WP.29/2013/94, ECE/TRANS/WP.29/GRE/2014/3).
52. The expert from the UK, introduced GRE-70-39, proposing amendments to the ten documents listed above in reply to European Commission letter (GRE-70-22) stating concerns with GRE documents submitted for WP.29 adoption. GRE agreed on the proposed corrections and requested the secretariat to submit the document as an informal document for consideration at the November 2013 session of WP.29.
[Proposal returned to GRE for further consideration.]
10. GRE reviewed and unanimously adopted the pending amendment proposals so as to consolidate the existing Regulations before they are frozen and superseded by three new Regulations that are in drafting:
1 | Except for the part which was already adopted by WP.29 as ECE/TRANS/WP.29/2013/75/Rev.1 and Add.1 (note by the secretariat). |
2 | Except for the part which was already adopted by WP.29 as ECE/TRANS/WP.29/2013/90/Rev.1 (note by the secretariat). |
3 | Except for the part which was already adopted by WP.29 as ECE/TRANS/WP.29/2013/92/Rev.1 (note by the secretariat). |
4 | Except for the part which was already adopted by WP.29 as ECE/TRANS/WP.29/2013/93/Rev.1 (note by the secretariat). |
5 | Except for Section B on Regulation No. 45 which was already submitted to WP.29 as ECE/TRANS/WP.29/2016/77 (note by the secretariat). |
21. GRE requested IWG SLR to consider GRE-71-23 and to consolidate into a horizontal document, harmonized definitions in lighting and light-signalling Regulations. For the same purpose, GRE referred to IWG SLR collective proposals, such as compliance obligations with installation requirements, definition of “type” with regard to the manufacturer and trade names/marks and provisions for the conformity of production, including those that had been referred back by WP.29 (ECE/TRANS/WP.29/GRE/2013/55/Rev.1, ECE/TRANS/WP.29/2013/68, ECE/TRANS/ WP.29/2013/69, ECE/TRANS/WP.29/2013/71, ECE/TRANS/WP.29/2013/72, ECE/ TRANS/WP.29/2013/76, ECE/TRANS/WP.29/2013/79, ECE/TRANS/WP.29/2013/83, ECE/TRANS/WP.29/2013/84, ECE/TRANS/WP.29/2013/85, ECE/TRANS/WP.29/ 2013/86, ECE/TRANS/WP.29/2013/87, ECE/TRANS/WP.29/2013/88, ECE/TRANS/ WP.29/2013/89, ECE/TRANS/WP.29/2013/94, ECE/TRANS/WP.29/GRE/2014/3).
52. The expert from the UK, introduced GRE-70-39, proposing amendments to the ten documents listed above in reply to European Commission letter (GRE-70-22) stating concerns with GRE documents submitted for WP.29 adoption. GRE agreed on the proposed corrections and requested the secretariat to submit the document as an informal document for consideration at the November 2013 session of WP.29.
[Proposal returned to GRE for further consideration.]
10. GRE reviewed and unanimously adopted the pending amendment proposals so as to consolidate the existing Regulations before they are frozen and superseded by three new Regulations that are in drafting:
1 | Except for the part which was already adopted by WP.29 as ECE/TRANS/WP.29/2013/75/Rev.1 and Add.1 (note by the secretariat). |
2 | Except for the part which was already adopted by WP.29 as ECE/TRANS/WP.29/2013/90/Rev.1 (note by the secretariat). |
3 | Except for the part which was already adopted by WP.29 as ECE/TRANS/WP.29/2013/92/Rev.1 (note by the secretariat). |
4 | Except for the part which was already adopted by WP.29 as ECE/TRANS/WP.29/2013/93/Rev.1 (note by the secretariat). |
5 | Except for Section B on Regulation No. 45 which was already submitted to WP.29 as ECE/TRANS/WP.29/2016/77 (note by the secretariat). |
21. GRE requested IWG SLR to consider GRE-71-23 and to consolidate into a horizontal document, harmonized definitions in lighting and light-signalling Regulations. For the same purpose, GRE referred to IWG SLR collective proposals, such as compliance obligations with installation requirements, definition of “type” with regard to the manufacturer and trade names/marks and provisions for the conformity of production, including those that had been referred back by WP.29 (ECE/TRANS/WP.29/GRE/2013/55/Rev.1, ECE/TRANS/WP.29/2013/68, ECE/TRANS/ WP.29/2013/69, ECE/TRANS/WP.29/2013/71, ECE/TRANS/WP.29/2013/72, ECE/ TRANS/WP.29/2013/76, ECE/TRANS/WP.29/2013/79, ECE/TRANS/WP.29/2013/83, ECE/TRANS/WP.29/2013/84, ECE/TRANS/WP.29/2013/85, ECE/TRANS/WP.29/ 2013/86, ECE/TRANS/WP.29/2013/87, ECE/TRANS/WP.29/2013/88, ECE/TRANS/ WP.29/2013/89, ECE/TRANS/WP.29/2013/94, ECE/TRANS/WP.29/GRE/2014/3).
52. The expert from the UK, introduced GRE-70-39, proposing amendments to the ten documents listed above in reply to European Commission letter (GRE-70-22) stating concerns with GRE documents submitted for WP.29 adoption. GRE agreed on the proposed corrections and requested the secretariat to submit the document as an informal document for consideration at the November 2013 session of WP.29.
[Proposal returned to GRE for further consideration.]
10. GRE reviewed and unanimously adopted the pending amendment proposals so as to consolidate the existing Regulations before they are frozen and superseded by three new Regulations that are in drafting:
1 | Except for the part which was already adopted by WP.29 as ECE/TRANS/WP.29/2013/75/Rev.1 and Add.1 (note by the secretariat). |
2 | Except for the part which was already adopted by WP.29 as ECE/TRANS/WP.29/2013/90/Rev.1 (note by the secretariat). |
3 | Except for the part which was already adopted by WP.29 as ECE/TRANS/WP.29/2013/92/Rev.1 (note by the secretariat). |
4 | Except for the part which was already adopted by WP.29 as ECE/TRANS/WP.29/2013/93/Rev.1 (note by the secretariat). |
5 | Except for Section B on Regulation No. 45 which was already submitted to WP.29 as ECE/TRANS/WP.29/2016/77 (note by the secretariat). |
21. GRE requested IWG SLR to consider GRE-71-23 and to consolidate into a horizontal document, harmonized definitions in lighting and light-signalling Regulations. For the same purpose, GRE referred to IWG SLR collective proposals, such as compliance obligations with installation requirements, definition of “type” with regard to the manufacturer and trade names/marks and provisions for the conformity of production, including those that had been referred back by WP.29 (ECE/TRANS/WP.29/GRE/2013/55/Rev.1, ECE/TRANS/WP.29/2013/68, ECE/TRANS/ WP.29/2013/69, ECE/TRANS/WP.29/2013/71, ECE/TRANS/WP.29/2013/72, ECE/ TRANS/WP.29/2013/76, ECE/TRANS/WP.29/2013/79, ECE/TRANS/WP.29/2013/83, ECE/TRANS/WP.29/2013/84, ECE/TRANS/WP.29/2013/85, ECE/TRANS/WP.29/ 2013/86, ECE/TRANS/WP.29/2013/87, ECE/TRANS/WP.29/2013/88, ECE/TRANS/ WP.29/2013/89, ECE/TRANS/WP.29/2013/94, ECE/TRANS/WP.29/GRE/2014/3).
52. The expert from the UK, introduced GRE-70-39, proposing amendments to the ten documents listed above in reply to European Commission letter (GRE-70-22) stating concerns with GRE documents submitted for WP.29 adoption. GRE agreed on the proposed corrections and requested the secretariat to submit the document as an informal document for consideration at the November 2013 session of WP.29.