Project timeline envisioning submission of final recommendations to the GRB in September 2014 followed by adoption of the new minimum-noise GTR by WP.29 in March 2015.
OICA presented an outline that takes into consideration the timeframe as contained in the ToR of the working group. This proposed timeline is intended to clearly determine the necessary next steps of the IWG so to deliver to GRB and WP29 an anticipated draft GTR by September 2014 and November 2014 respectively. Beside a timely schedule for next meetings, it also clearly describes the necessary work that needs to be accomplished during those meetings. Following this timeline would result in a publication of the GTR late 2015. The proposed timeline was accepted by all involved parties.