Show admin view
Proposal for amendments to Regulation No. 110
Document GRSG/2016/9
11 February 2016

Proposal to correct a typographical error in paragraph 7.1. where the reference should be to paragraph 8.22 rather than 8.21, to remove a duplicate and contradictory reference in Annex 4A to the requirements of Class 1 pressure relief valves, and to align paragraph 2.2. of Annex 4H with paragraph 18.6.1.2. limiting the delay in switching-off of the automatic valve after stalling of the engine to two seconds (rather than five as presently in the text).

Submitted by Netherlands
Status: Superseded
Download document
Previous Documents, Discussions, and Outcomes
4.7.7. | Proposal for Supplement 5 to the 01 series of amendments to Regulation No. 110
12. | Regulation No. 110 (Specific components for CNG)

37. The expert from the Netherlands presented ECE/TRANS/WP.29/GRSG/2016/9 aimed at correcting a typographical error and clarifying the current provisions of the Regulation. He also introduced ECE/TRANS/WP.29/GRSG/2016/10 proposing to insert provisions for LNG fuel connector as specified in ISO 12617:2015. Both documents received a number of comments. The expert from France raised a study reservation on the reference to the ISO standard in paragraph 2.2. of Annex 4J. Following the discussion, GRSG adopted both proposal as reproduced below and requested the secretariat to submit it to WP.29 and AC.1 for consideration at their November 2016 sessions, as part (see paras. 32 and 36 above) of draft Supplement 5 to the 01 series of amendments to UN Regulation No. 110:

Paragraph 7.1., correct “paragraphs 8.12. to 8.21.” to read “paragraphs 8.12. to 8.22.”.

Annex 4A, paragraph 4.2.4., correct “of Class 1 and Class 2” to read “of Class 2”.

Annex 4H, paragraph 2.2., correct “than 5 seconds” to read “than 2 seconds”.

Annex 4J
Paragraph 2.2.
, shall be deleted.

Paragraph 3.1.6., correct “shall be not be” to read “shall not be”.

Insert new paragraphs 4. and 4.1., to read:
4. LNG filling receptacle dimensions
4.1. Figure 1 shows the dimensions of the LNG filling receptacle.

Figure 1
Dimensions of the receptacle
[Figure provided in the session report.]
"

38. GRSG agreed to resume consideration at the next session of GRSG on the ISO reference on the basis of a revised proposal jointly prepared by the Netherlands and NGV Global, taking into account the comments received.

Related and Previous Documents
WP.29/2016/95
Relates to UN R110 |