Informal Group on GTR 9-Phase 2 | Session 6 | 19-20 Mar 2013
Washington, DC
Agenda Item 6.
Availability of drawing package and manual, process to review those data
Documentation
GTR9-05-04 Flex PLI GTR User Manual (Rev D) (Humanetics)
GTR9-05-31 FlexPLI version GTR drawing package (zip compressed file) (Humanetics)
GTR9-06-04 Mutual Resolution 1 guidelines for test tools
GTR9-06-05 Schedule for preparing an addendum to MR 1 for FlexPLI test tool
GTR9-06-06 FlexPLI GTR User Manual Rev. E 2013 (Humanetics)
GTR9-06-09 Review of FlexPLI drawing package and consistency check against hardware (BASt)
GTR9-06-22 FlexPLI Drawing Review (surface level) Update (JASIC)
GTR9-06-23 FlexPLI Drawing Review (Cellbond)
GTR9-06-23/Rev.1 FlexPLI Drawing Review (revised) (Cellbond)