Informal Group on GTR 9-Phase 2 | Session 7 | 3 Jul 2013
WebEx Teleconference
Agenda Item 5.
Review of the status of the drawing package and manual
Documentation
GTR9-05-31/Rev.1 FlexPLI version GTR drawing package: revision (zip compressed file) (Humanetics)
GTR9-07-04 Information on GTR 9-related drawing packages
GTR9-07-05/Corr.1 FlexPLI: Result of drawing review (surface level) (JASIC)
GTR9-07-06/Corr.1 Result of the FlexPLI manual review (JASIC)
GTR9-07-14 Flex PLI: Detailed Review of Drawing Package and Itemized Check against Master Leg Impactor SN03 (BASt and BGS)