|
8 Jan 2015
|
Draft position on WLTP Phase 2: Japan (Japan)
|
WLTP-09-20
|
|
8 Jan 2015
|
Current status of light vehicle fuel economy A/C test in Japan (Japan)
|
WLTP-09-20/Annex
|
|
8 Jan 2015
|
Updated WLTP open issues table
|
WLTP-09-03
|
|
8 Jan 2015
|
Working draft of the revised GTR No. 15 (WLTP) as of 19 Dec 2014
|
WLTP-09-04
|
|
8 Jan 2015
|
WLTP: Progress report on downscaling and gearshifting
|
WLTP-09-07
|
|
8 Jan 2015
|
WLTP: Progress report on Annex 4 (Road Load Determination)
|
WLTP-09-08
|
|
8 Jan 2015
|
WLTP: Road load determination wheel alignment
|
WLTP-09-10
|
|
9 Jan 2015
|
WLTP: Additional Pollutants- Briefing on the phone conference on 19 December 2014 (JRC)
|
WLTP-09-17
|
|
9 Jan 2015
|
Report on WLTP amendment draft issues
|
WLTP-09-18
|
|
9 Jan 2015
|
WLTP: Statistical requirements concerning the number of tests (EC)
|
WLTP-09-22
|
|
9 Jan 2015
|
Japanese position on WLTP correction algorithms (Japan)
|
WLTP-09-23
|
|
9 Jan 2015
|
Japanese feedback on deviations from target speed under WLTP (Japan)
|
WLTP-09-24
|
|
9 Jan 2015
|
Starting note for WLTP Phase 2 (Japan)
|
WLTP-08-41/Rev.1
|
|
9 Jan 2015
|
Annex to the starting note for WLTP Phase 2: Questionnaire items (Japan)
|
WLTP-08-41/Annex-Rev.1
|
|
9 Jan 2015
|
WLTP: Denomination of temperature units (Audi)
|
WLTP-09-19
|
|
21 Jan 2015
|
Updated agenda for the 9th WLTP informal working group session
|
WLTP-09-02/Rev.2
|
|
21 Jan 2015
|
Progress report of the WLTP subgroup on electric vehicles
|
WLTP-09-05/Rev.1
|
|
21 Jan 2015
|
WLTP: Development of Utility Factors
|
WLTP-09-06/Rev.1
|
|
21 Jan 2015
|
WLTP: Alternative warm-up procedure (Open issue 19) (Japan)
|
WLTP-09-09/Rev.1
|
|
21 Jan 2015
|
WLTP: Number of tests (Open issue item 27) (Japan)
|
WLTP-09-21/Rev.1
|
|
21 Jan 2015
|
Establishment of a WLTP drafting group
|
WLTP-09-27
|
|
21 Jan 2015
|
Review of items for consideration by the WLTP drafting subgroup
|
WLTP-09-26
|
|
21 Jan 2015
|
WLTP: ACEA analysis of normalization report (ACEA)
|
WLTP-09-25
|
|
21 Jan 2015
|
Progress report of the WLTP task force on the coasting method
|
WLTP-09-15
|
|
25 Jan 2015
|
Briefing on the phone conferences of the Additional Pollutants Task Force (JRC)
|
WLTP-09-17/Rev.1
|
|
28 Jan 2015
|
Draft minutes of the 9th WLTP informal group session
|
WLTP-09-29
|
|
11 Feb 2015
|
Invitation to the 10th WLTP informal working group session
|
WLTP-10-01
|
|
11 Feb 2015
|
WLTP open issues table
|
WLTP-10-03
|
|
7 Apr 2015
|
Report on WLTP GTR amendment draft issues
|
WLTP-10-34
|
|
7 Apr 2015
|
WLTP discussion paper on “Speed Trace Violations / Drive Trace Index” (Open issues 29, 30, and 41)
|
WLTP-10-31
|
|
7 Apr 2015
|
Draft WLTP GTR text: Group decision on “Settings of engine” (OIL#28)
|
WLTP-10-28
|
|
7 Apr 2015
|
WLTP: Handling of Ki (Open issues 34-38)
|
WLTP-10-27
|
|
7 Apr 2015
|
“Handling of Ki” (OIL#34 & 1b_4): Supplemental document
|
WLTP-10-27/Add.1
|
|
7 Apr 2015
|
GTR No. 15 (WLTP) draft amendments: Version 3 April 2015
|
WLTP-10-04
|
|
7 Apr 2015
|
Progress report of the WLTP Gear Shift Task Force
|
WLTP-10-11
|
|
7 Apr 2015
|
WLTP: Progress report on flat belt and wind tunnel method (BMW and UTAC)
|
WLTP-10-14
|
|
7 Apr 2015
|
Progress report on the validation program for the WLTP wind tunnel method (UTAC and VW)
|
WLTP-10-15
|
|
7 Apr 2015
|
Draft text of the WLTP wind tunnel method (version 17)
|
WLTP-10-16
|
|
7 Apr 2015
|
WLTP Phase 2: Explanation of CoP and ISC (Japan)
|
WLTP-10-39
|
|
7 Apr 2015
|
Progress report of the task force on methods for the determination of system equivalency (Audi)
|
WLTP-10-33
|
|
7 Apr 2015
|
Draft text for the WLTP road load family determination (BMW)
|
WLTP-10-18
|
|
7 Apr 2015
|
WLTP: Correction time between warm-up and coast-down (Audi)
|
WLTP-10-19
|
|
7 Apr 2015
|
WLTP bag analysis drift correction (ACEA and Japan)
|
WLTP-10-29
|
|
7 Apr 2015
|
Proposal for WLTP road load determination (Japan)
|
WLTP-10-24
|
|
7 Apr 2015
|
WLTP Annex 4 and 7, delta cd*A: Alternative determination methods (BMW)
|
WLTP-10-21
|
|
9 Apr 2015
|
WLTP road load determination (Annex 4) progress report
|
WLTP-10-13
|
|
9 Apr 2015
|
WLTP: Onboard anemometry methodology decomposition (Ford)
|
WLTP-10-22
|
|
9 Apr 2015
|
GTR No. 15 (WLTP) draft amendments: Version 3 April 2015-clean version without track changes
|
WLTP-10-04/Rev.1
|
|
9 Apr 2015
|
Review of WLTP amendment open drafting issues
|
WLTP-10-35
|
|
9 Apr 2015
|
Progress report on the validation of WLTP additional pollutants test methods
|
WLTP-10-32
|
|
10 Apr 2015
|
WLTP REESS Charge Balance correction proposal
|
WLTP-10-05
|
|
10 Apr 2015
|
ACEA comments on number of certification tests under GTR No. 15 (WLTP) (ACEA)
|
WLTP-10-26
|
|
10 Apr 2015
|
Review of harmonized vehicle propulsion system definitions (VPSD)
|
WLTP-10-36
|
|
10 Apr 2015
|
Presentation on WLTP Asian round robin validation testing (Japan)
|
WLTP-10-37
|
|
28 Apr 2015
|
Draft agenda for the 10th WLTP informal working group session
|
WLTP-10-02/Rev.3
|
|
28 Apr 2015
|
WLTP road load family: Proposal on a family definition for road load determination (BMW)
|
WLTP-10-17/Rev.1
|
|
28 Apr 2015
|
WLTP Phase 2 questionnaire results (Japan)
|
WLTP-10-38/Rev.2
|
|
28 Apr 2015
|
Update on WLTP "number of tests" open issue item (Japan)
|
WLTP-10-30/Rev.1
|
|
28 Apr 2015
|
Status report on deliberations concerning the number of tests under WLTP GTR No. 15 (JRC)
|
WLTP-10-25/Rev.1
|
|
28 Apr 2015
|
WLTP: Status of road load tolerance regulation and evaluation criteria in Korea (KATRI)
|
WLTP-10-40/Rev.1
|
|
28 Apr 2015
|
ACEA proposals concerning the WLTP driver selectable mode switch (ACEA)
|
WLTP-10-41
|
|
28 Apr 2015
|
WLTP: Conclusions of the Additional Pollutants Task Force
|
WLTP-10-20
|
|
28 Apr 2015
|
WLTP: Default road load determination method (RDW and Daimler)
|
WLTP-10-23
|
|
28 Apr 2015
|
Progress report of the WLTP e-Lab/Electric vehicles subgroup
|
WLTP-10-12
|
|
28 Apr 2015
|
WLTP: Proposal concerning fuel-cell vehicle test procedure
|
WLTP-10-10
|
|
12 May 2015
|
Invitation to the 11th WLTP informal working group session (Revision 1) (EC)
|
WLTP-11-01/Rev.1
|
|
4 Jun 2015
|
WLTP: Correction time between warm-up and coast-down (Audi)
|
WLTP-10-19/Rev.1
|
|
4 Jun 2015
|
WLTP alternative delta cd A determination (BMW)
|
WLTP-11-18
|
|
4 Jun 2015
|
WLTP: Default road load determination method (RDW and Daimler)
|
WLTP-11-17
|
|
4 Jun 2015
|
Initial review WLTP provisions with Torque Meter relevance
|
WLTP-11-16
|
|
4 Jun 2015
|
WLTP: Onboard anemometry methodology proposals (Ford)
|
WLTP-11-14
|
|
4 Jun 2015
|
WLTP open issues list
|
WLTP-11-03
|
|
4 Jun 2015
|
Report on WLTP GTR amendment drafting issues
|
WLTP-11-09
|
|
4 Jun 2015
|
WLTP Gearshifting Task Force presentation on crawler gear requirements
|
WLTP-11-06
|
|
4 Jun 2015
|
Wind tunnel method as an alternative to road load determination method under GTR No. 15 (WLTP) (BMW and UTAC)
|
WLTP-11-12
|
|
4 Jun 2015
|
WLTP amendments: Open drafting issues
|
WLTP-11-10
|
|
4 Jun 2015
|
WLTP Gearshifting Task Force proposal for Annex 2 (gear selection) of GTR 15
|
WLTP-11-07
|
|
4 Jun 2015
|
Working draft "Phase 1b" amended GTR No. 15 (WLTP) as of 26 May 2015
|
WLTP-11-04
|
|
4 Jun 2015
|
Status report of the WLTP Gearshifting Task Force
|
WLTP-11-05
|
|
4 Jun 2015
|
WLTP road load determination (Annex 4) progress report
|
WLTP-11-11
|
|
4 Jun 2015
|
WLTP Gearshifting Task Force: Additional discussion points
|
WLTP-11-08
|
|
4 Jun 2015
|
Draft minutes of the 10th WLTP informal group session
|
WLTP-10-42
|
|
5 Jun 2015
|
WLTP: proposal to establish vehicle manufacturer responsibility for the accuracy of road load specifications (Japan)
|
WLTP-11-13
|
|
5 Jun 2015
|
WLTP: Status report on the development of a method for system equivalency determination under Annex 9 (Audi)
|
WLTP-11-23
|
|
5 Jun 2015
|
WLTP: Progress report of the Trace Index Task Force (Japan)
|
WLTP-11-21
|
|
5 Jun 2015
|
Ford Motor research on driving trace index tolerance criteria (Ford)
|
WLTP-11-22
|
|
5 Jun 2015
|
Report on WLTP "Number of Tests" open issue (Japan)
|
WLTP-11-20
|
|
8 Jun 2015
|
Report on the WLTP round robin exercise (UTAC)
|
WLTP-11-25
|
|
9 Jun 2015
|
Draft agenda for the 11th WLTP informal group session (revision 1)
|
WLTP-11-02/Rev.1
|
|
11 Jun 2015
|
WLTP: Measurement of Running Resistance by Torquemeter Method (Ford)
|
WLTP-11-15
|
|
11 Jun 2015
|
WLTP: Vehicle weight and mass definitions
|
WLTP-11-24
|
|
19 Jun 2015
|
Invitation to the 12th session of the WLTP informal working group
|
WLTP-12-01
|
|
19 Jun 2015
|
Attachment to the WLTP-12 invitation: Directions to the office of JASIC
|
WLTP-12-01/Att.1
|
|
19 Jun 2015
|
Attachment to the WLTP-12 invitation: Tokyo Hotel Accommodations
|
WLTP-12-01/Att.2
|
|
19 Jun 2015
|
Attachment to the WLTP-12 invitation: Tokyo Metro Subway Map
|
WLTP-12-01/Att.3
|
|
19 Jun 2015
|
Attachment to the WLTP-12 invitation: Suica-Pasmo Card Tokyo network
|
WLTP-12-01/Att.4
|
|
3 Jul 2015
|
Results of the questionnaire on the Phase 2 development of GTR No. 15 (WLTP) (Japan)
|
WLTP-11-26/Rev.1
|
|
4 Jul 2015
|
Fuel tank level under WLTP testing: ACEA fuel tank levels in real life use (ACEA)
|
WLTP-11-27
|
|
4 Jul 2015
|
Minutes from the 11th WLTP informal group session
|
WLTP-11-28
|
|
7 Jul 2015
|
Progress report of the WLTP subgroup on electric vehicles (revised)
|
WLTP-11-19
|
|
17 Sep 2015
|
Draft agenda for the 12th WLTP informal group session
|
WLTP-12-02/Rev.1
|
|
17 Sep 2015
|
WLTP informal group open issues table
|
WLTP-12-03
|
|
17 Sep 2015
|
GTR No. 15 (WLTP) Phase 1b final draft text of torque-meter related provisions
|
WLTP-12-05
|
|
17 Sep 2015
|
GTR No. 15 (WLTP) Phase 1b final draft text with regard to on-board anemometry
|
WLTP-12-06
|
|
17 Sep 2015
|
GTR No. 15 (WLTP) Phase 1b final draft text concerning the road load family matrix
|
WLTP-12-07
|
|
18 Sep 2015
|
WLTP presentation: Result Postprocessing Proposal (BMW)
|
WLTP-12-08
|
|
18 Sep 2015
|
WLTP Result Postprocessing Proposal (BMW)
|
WLTP-12-09
|
|
18 Sep 2015
|
WLTP result postprocessing tool (BMW)
|
WLTP-12-10
|
|
21 Sep 2015
|
GTR No. 15 (WLTP) Phase 1b: Proposal for definitions
|
WLTP-12-11
|
|
21 Sep 2015
|
GTR No. 15 (WLTP) Phase 1b: Proposal for particle definitions
|
WLTP-12-12
|
|
23 Sep 2015
|
GTR No. 15 (WLTP) Phase 1b: Working draft text (Clean version)
|
WLTP-12-04/a
|
|
23 Sep 2015
|
GTR No. 15 (WLTP) Phase 1b: Working draft text as of 20 September 2015
|
WLTP-12-04/b
|
|
25 Sep 2015
|
WLTP presentation: Result Postprocessing Proposal (Revised) (BMW)
|
WLTP-12-08/Rev.1
|
|
25 Sep 2015
|
WLTP Result Postprocessing Proposal (Revised) (BMW)
|
WLTP-12-09/Rev.1
|
|
25 Sep 2015
|
WLTP result postprocessing tool (Revised) (BMW)
|
WLTP-12-10/Rev.1
|
|
25 Sep 2015
|
GTR No. 15 (WLTP) Phase 1b review of open and closed drafting issues
|
WLTP-12-13
|
|
25 Sep 2015
|
GTR No. 15 (WLTP) Phase 1b: Wind tunnel method and chassis dyno prescriptions (revision 2) (BMW, UTAC, and VW)
|
WLTP-12-14
|
|
25 Sep 2015
|
GTR No. 15 (WLTP) Phase 1b: Progress report of the task force on minimizing the number of tests
|
WLTP-12-15
|
|
25 Sep 2015
|
GTR No. 15 (WLTP) Phase 1b: Draft GTR text concerning the number of tests
|
WLTP-12-16
|
|
25 Sep 2015
|
GTR No. 15 (WLTP) Phase 1b: Status report on the resolution of gearshift open issues
|
WLTP-12-17
|
|
25 Sep 2015
|
GTR No. 15 (WLTP) Phase 1b: Report on the status of GTR text drafting issues
|
WLTP-12-18
|
|
25 Sep 2015
|
GTR No. 15 (WLTP) Phase 1b: Status report on the testing of electric vehicles
|
WLTP-12-19
|
|
25 Sep 2015
|
GTR No. 15 (WLTP) Phase 1b: Final review of GTR definitions
|
WLTP-12-20
|
|
25 Sep 2015
|
GTR No. 15 (WLTP) Phase 1b: Final draft GTR text concerning the wind tunnel method
|
WLTP-12-21
|
|
25 Sep 2015
|
GTR No. 15 (WLTP) Phase 1b: Status report on control of additional pollutants (JRC)
|
WLTP-12-22
|
|
28 Sep 2015
|
GTR No. 15 (WLTP) Phase 1b: Proposal for control of additional pollutants
|
WLTP-12-23
|
|
28 Sep 2015
|
GTR No. 15 (WLTP) Phase 1b: Road Load Matrix Family (RDW and ACEA)
|
WLTP-12-24
|
|
28 Sep 2015
|
GTR No. 15 (WLTP) Phase 1b: Progress report on Annex 4 road load determination
|
WLTP-12-25
|
|
28 Sep 2015
|
GTR No. 15 (WLTP) Phase 1b: Review of tolerances under Annex 4 (BMW and TNO)
|
WLTP-12-26
|
|
29 Sep 2015
|
GTR No. 15 (WLTP) Phase 1b: Proposal for “Speed Trace Violations/Drive Trace Index”
|
WLTP-12-27
|
|
29 Sep 2015
|
GTR No. 15 (WLTP) Phase 1b: Draft GTR text concerning the number of tests
|
WLTP-12-16/Rev.2
|
|
29 Sep 2015
|
Draft agenda for the 5th WLTP Drafting subgroup session
|
WLTP-12-28
|
|
1 Oct 2015
|
Measurement of ethanol, formaldehyde and acetaldehyde from a flex-fuel vehicle exhaust over the WLTC (AVL, JRC, and Horiba)
|
WLTP-12-31
|
|
1 Oct 2015
|
GTR No. 15 (WLTP) validation phase 2 presentation (JRC)
|
WLTP-12-30
|
|
1 Oct 2015
|
WLTP: Study on Evaluation Criteria of Road Load Tolerance in Korea (KATRI)
|
WLTP-12-29/Rev.1
|
|
1 Oct 2015
|
GTR No. 15 (WLTP) Phase 1b: Status report on the resolution of gearshift open issues (Revised)
|
WLTP-12-17/Rev.1
|
|
1 Oct 2015
|
GTR No. 15 (WLTP) Phase 1b: Final draft text concerning the road load family matrix (Revised)
|
WLTP-12-07/Rev.1
|
|
1 Oct 2015
|
GTR No. 15 (WLTP) Phase 1b final draft text of torque-meter related provisions (Revised)
|
WLTP-12-05/Rev.1
|
|
14 Oct 2015
|
GTR No. 15 (WLTP) Phase 1b: Status report on the testing of electric vehicles (revised)
|
WLTP-12-19/Rev.1
|
|
15 Oct 2015
|
GTR No. 15 (WLTP): Interim results of the Asian round-robin validation testing (Japan)
|
WLTP-12-32
|
|
15 Oct 2015
|
Minutes of the 12th WLTP informal working group session
|
WLTP-12-33
|
|
30 Dec 2015
|
Invitation to the 13th WLTP informal group session
|
WLTP-13-01
|
|
30 Dec 2015
|
Draft agenda for the 13th WLTP informal group session
|
WLTP-13-02
|
|
30 Dec 2015
|
Open issues table for the 13th WLTP informal group session
|
WLTP-13-03
|
|
30 Dec 2015
|
Summary of the remaining issues for phase 1b in the development of GTR No. 15
|
WLTP-13-04
|
|
30 Dec 2015
|
Amendments to the formal GRPE proposal of amendments to GTR No. 15 (OICA)
|
WLTP-13-05
|
|
30 Dec 2015
|
Appendix to the draft proposal for amendments to the formal proposal for phase 1b of GTR No. 15 (OICA)
|
WLTP-13-05/App.1
|
|
30 Dec 2015
|
Proposed organization for the Phase 2 development of GTR No. 15
|
WLTP-13-08
|
|
30 Dec 2015
|
GTR No. 15 (WLTP) Phase 2: Work items and schedule
|
WLTP-13-09
|
|
30 Dec 2015
|
GTR No. 15 (WLTP) Phase 2: Further consideration of work items (Japan)
|
WLTP-13-10
|
|
30 Dec 2015
|
Japan proposal for new evaporative emissions test procedure under GTR No. 15 (Japan)
|
WLTP-13-11
|