25 Feb 2014
|
GTR 9-Phase 2: Status of Activity List Items (updated in the 9th meeting, 17 December 2013)
|
GTR9-04-03/Rev.3
|
2014-02-25 |
7 Dec 2013
|
Draft agenda for the 9th GTR 9-Phase 2 informal group session
|
GTR9-09-01
|
2013-12-07 |
16 Dec 2013
|
Final agenda for the 9th GTR 9-Phase 2 informal group session
|
GTR9-09-01/Rev.1
|
2013-12-16 |
8 Dec 2017
|
Minutes of the 9th GTR 9-Phase 2 informal group session
|
GTR9-09-02
|
2017-12-08 |
7 Dec 2013
|
FlexPLI weight tolerances: Reduction of proposed weight tolerances (OICA)
|
GTR9-09-03
|
2013-12-07 |
16 Dec 2013
|
Lower Legform Test Area: Justification of the Need for a Relaxation Zone (Revised) (OICA)
|
GTR9-09-04/Rev.1
|
2013-12-16 |
7 Dec 2013
|
Proposal of 01 series of amendments to Regulation No. 127 (Japan)
|
GTR9-09-05
|
2013-12-07 |
7 Dec 2013
|
Proposed amendments of the three-point bending certification test figure in GTR No. 9 (Japan)
|
GTR9-09-06
|
2013-12-07 |
12 Dec 2013
|
FlexPLI GTR User Manual Rev. F (Draft) 2013 (Humanetics)
|
GTR9-09-07
|
2013-12-12 |
16 Dec 2013
|
Flex PLI GTR: User Manual (Humanetics)
|
GTR9-09-07/Rev.1
|
2013-12-16 |
12 Dec 2013
|
Updates to Flex PLI Manual Rev E to Rev F (Humanetics)
|
GTR9-09-08
|
2013-12-12 |
16 Dec 2013
|
Updates to Flex PLI Manual Rev E to Rev F (Humanetics)
|
GTR9-09-08/Rev.1
|
2013-12-16 |
12 Dec 2013
|
Flex PLI: Max and Min Femur Certification Analysis (Humanetics)
|
GTR9-09-09
|
2013-12-12 |
12 Dec 2013
|
Flex PLI Review: Weight Tolerance (Humanetics)
|
GTR9-09-10
|
2013-12-12 |
21 Feb 2014
|
Reviewed FlexPLI version GTR drawing package (updated) (Humanetics)
|
GTR9-09-11/Rev.1
|
2014-02-21 |
22 May 2014
|
Reviewed FlexPLI version GTR drawing package, Rev. 2 (final version) (Humanetics)
|
GTR9-09-11/Rev.2
|
2014-05-22 |
9 Feb 2015
|
Reviewed FlexPLI version GTR drawing package, Rev. 4 (final version status Feb. 2015) (Humanetics)
|
GTR9-09-11/Rev.4
|
2015-02-09 |
12 Dec 2013
|
Details of Drawing Updates to Flex GTR9 Regulation Drawings (Humanetics)
|
GTR9-09-12
|
2013-12-12 |
12 Dec 2013
|
Flex PLI: Flesh Neoprene Corridor (Humanetics)
|
GTR9-09-13
|
2013-12-12 |
12 Dec 2013
|
Flex PLI Review: Dimensional Tolerance (Humanetics)
|
GTR9-09-14
|
2013-12-12 |
16 Dec 2013
|
Change to foam flesh used by EEVC lower & upper legforms (TRL)
|
GTR9-09-15
|
2013-12-16 |
16 Dec 2013
|
Flex PLI Drawing Review (Cellbond)
|
GTR9-09-16
|
2013-12-16 |
21 Feb 2014
|
Legform Tests: Results from Round 2, Flex-PLI (TRL)
|
GTR9-09-17
|
2014-02-21 |