1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 |
---|---|---|---|---|---|---|---|---|---|
Document Title | Draft Regulation on electric vehicles of category L | ||||||||
Reference Number | GRSP/2014/11 | ||||||||
Date |
28 Feb 2014
|
||||||||
Summary | Draft text for a new UN regulation on the safety of electric motorcycles and related vehicles. | ||||||||
Rulemaking Area(s) | REESS and UN R136 Electric Motorcycle Safety | ||||||||
Proposal Status | Superseded | ||||||||
Meeting(s) | |||||||||
Related Documents | |||||||||
REESS-11-10 | Working draft Regulation on electric vehicles of category L (superseded) | ||||||||
GRSP-55-07 | Proposal of amendments to document GRSP/2014/11 (superseded) | ||||||||
GRSP-55-25/Rev.1 | Draft Regulation on electric vehicles of category L (superseded) | ||||||||
GRSP-55-29 | New UN Regulation on electric vehicles of category L | ||||||||
GRSP-55-22 | Proposal for Supplement to the Draft Regulation on electric vehicles of category L (superseded) | ||||||||
REESS-12-04 | Revised proposal of amendments to the draft Regulation on electric vehicles of category L (superseded) | ||||||||
REESS-12-05 | Working draft of the proposed new regulation on the approval of category L vehicles with regard to requirements for the electric power train (superseded) | ||||||||
REESS-12-09 | Proposal for amendments to the Draft Regulation on the safety of electric vehicles of category L (superseded) | ||||||||
GRSP/2014/26 | Proposal for amendments to the draft new Regulation on electric motorcycle safety (superseded) | ||||||||
GRSP-56-01 | Proposal for corrections to the draft regulation on electric motorcycle safety (superseded) | ||||||||
WP.29/2015/69 | Draft Regulation on electric vehicles of category L | ||||||||
Downloads | |||||||||
UNECE server | .pdf format | ||||||||
Excerpts from session reports related to this document | |||||||||
GRSP | Session 55 | 19-23 May 2014 |
39. The expert from Germany, Chair of the IWG on Rechargeable Energy Storage System (REESS) made a presentation (GRSP-55-29) to introduce ECE/TRANS/WP.29/GRSP/2014/11, aimed at proposing a draft UN Regulation on safety requirements with respect to the electric power train of vehicles of categories L1 with a maximum design speed exceeding 6 km/h. The expert from IMMA proposed some amendments (GRSP-55-07) to ECE/TRANS/WP.29/GRSP/2014/11. The majority of the Contracting Parties (Australia, France, Germany, the Netherlands, Spain, Sweden and the United Kingdom) rejected the introduction of additional provisions (para. 12 of ECE/TRANS/WP.29/GRSP/2014/11) in the text of the draft UN Regulation, to allow Contracting Parties to continue requiring the proof of compliance for post-crash requirements as proposed by the expert from Japan. GRSP referred GRSP-55-25-Rev.1 back to the IWG (including GRSP-55-22 proposed by the expert from Japan) and agreed to resume consideration of this agenda item at its December 2014 session, on the basis of an updated proposal submitted by the IWG. Finally, GRSP agreed to seek consent from WP.29 at its June 2014 session to extend the mandate of the IWG until June 2015. 39. The expert from Germany, Chair of the IWG on Rechargeable Energy Storage System (REESS) made a presentation (GRSP-55-29) to introduce ECE/TRANS/WP.29/GRSP/2014/11, aimed at proposing a draft UN Regulation on safety requirements with respect to the electric power train of vehicles of categories L1 with a maximum design speed exceeding 6 km/h. The expert from IMMA proposed some amendments (GRSP-55-07) to ECE/TRANS/WP.29/GRSP/2014/11. The majority of the Contracting Parties (Australia, France, Germany, the Netherlands, Spain, Sweden and the United Kingdom) rejected the introduction of additional provisions (para. 12 of ECE/TRANS/WP.29/GRSP/2014/11) in the text of the draft UN Regulation, to allow Contracting Parties to continue requiring the proof of compliance for post-crash requirements as proposed by the expert from Japan. GRSP referred GRSP-55-25-Rev.1 back to the IWG (including GRSP-55-22 proposed by the expert from Japan) and agreed to resume consideration of this agenda item at its December 2014 session, on the basis of an updated proposal submitted by the IWG. Finally, GRSP agreed to seek consent from WP.29 at its June 2014 session to extend the mandate of the IWG until June 2015. 39. The expert from Germany, Chair of the IWG on Rechargeable Energy Storage System (REESS) made a presentation (GRSP-55-29) to introduce ECE/TRANS/WP.29/GRSP/2014/11, aimed at proposing a draft UN Regulation on safety requirements with respect to the electric power train of vehicles of categories L1 with a maximum design speed exceeding 6 km/h. The expert from IMMA proposed some amendments (GRSP-55-07) to ECE/TRANS/WP.29/GRSP/2014/11. The majority of the Contracting Parties (Australia, France, Germany, the Netherlands, Spain, Sweden and the United Kingdom) rejected the introduction of additional provisions (para. 12 of ECE/TRANS/WP.29/GRSP/2014/11) in the text of the draft UN Regulation, to allow Contracting Parties to continue requiring the proof of compliance for post-crash requirements as proposed by the expert from Japan. GRSP referred GRSP-55-25-Rev.1 back to the IWG (including GRSP-55-22 proposed by the expert from Japan) and agreed to resume consideration of this agenda item at its December 2014 session, on the basis of an updated proposal submitted by the IWG. Finally, GRSP agreed to seek consent from WP.29 at its June 2014 session to extend the mandate of the IWG until June 2015. 39. The expert from Germany, Chair of the IWG on Rechargeable Energy Storage System (REESS) made a presentation (GRSP-55-29) to introduce ECE/TRANS/WP.29/GRSP/2014/11, aimed at proposing a draft UN Regulation on safety requirements with respect to the electric power train of vehicles of categories L1 with a maximum design speed exceeding 6 km/h. The expert from IMMA proposed some amendments (GRSP-55-07) to ECE/TRANS/WP.29/GRSP/2014/11. The majority of the Contracting Parties (Australia, France, Germany, the Netherlands, Spain, Sweden and the United Kingdom) rejected the introduction of additional provisions (para. 12 of ECE/TRANS/WP.29/GRSP/2014/11) in the text of the draft UN Regulation, to allow Contracting Parties to continue requiring the proof of compliance for post-crash requirements as proposed by the expert from Japan. GRSP referred GRSP-55-25-Rev.1 back to the IWG (including GRSP-55-22 proposed by the expert from Japan) and agreed to resume consideration of this agenda item at its December 2014 session, on the basis of an updated proposal submitted by the IWG. Finally, GRSP agreed to seek consent from WP.29 at its June 2014 session to extend the mandate of the IWG until June 2015. 39. The expert from Germany, Chair of the IWG on Rechargeable Energy Storage System (REESS) made a presentation (GRSP-55-29) to introduce ECE/TRANS/WP.29/GRSP/2014/11, aimed at proposing a draft UN Regulation on safety requirements with respect to the electric power train of vehicles of categories L1 with a maximum design speed exceeding 6 km/h. The expert from IMMA proposed some amendments (GRSP-55-07) to ECE/TRANS/WP.29/GRSP/2014/11. The majority of the Contracting Parties (Australia, France, Germany, the Netherlands, Spain, Sweden and the United Kingdom) rejected the introduction of additional provisions (para. 12 of ECE/TRANS/WP.29/GRSP/2014/11) in the text of the draft UN Regulation, to allow Contracting Parties to continue requiring the proof of compliance for post-crash requirements as proposed by the expert from Japan. GRSP referred GRSP-55-25-Rev.1 back to the IWG (including GRSP-55-22 proposed by the expert from Japan) and agreed to resume consideration of this agenda item at its December 2014 session, on the basis of an updated proposal submitted by the IWG. Finally, GRSP agreed to seek consent from WP.29 at its June 2014 session to extend the mandate of the IWG until June 2015. |
||||||||