Document Number GRBP-73-13
1 2 3 4 5 6 7 8 9 10
Document title Status report of the TPM and Tyre Installation task force
Date 21 Jan 2021
Status
Rulemaking area(s)
Meeting(s)
Related documents
Downloads: .pdf format .pptx format
Excerpts from session reports related to this document
GRBP | Session 73 | 26-29 Jan 2021

19. GRBP took note of the activities of the Task Force on Tyre Pressure Monitoring System and on Tyre Installation (TF TPMSTI) (GRBP-73-13) and addressed amendment proposals on the requirements for the communication interface between the towing and towed vehicles that had been prepared by TF TPMSTI (ECE/TRANS/WP.29/GRBP/2021/6 and GRBP-73-03).

20. GRBP adopted the proposals and requested the secretariat to include them in a revised document ECE/TRANS/WP.29/2021/10/Rev.1 for consideration and vote at the March 2021 sessions of WP.29 and AC.1 as part of a draft new 01 series of amendments to UN Regulation No. 141.