UN R110: Proposal for Supplement 2 to the 03 series of amendments
Download in .pdf format Download in .docx format

Proposal to introduce requirements for CNG compressor and CNG accumulator components designed to maintain stable pressure in fuel systems.

Reference Number: GRSG/2018/11
Origin: Netherlands
Date: 20 July 2018
Proposal Status: Superseded
Related Documents:
GRSG-114-03 | UN R110: Proposal for amendments
GRSG-115-19 | UN R110: Proposal for the 04 series of amendments
WP.29/2019/16 | UN R110: Proposal for the 04 series of amendments
Discussion(s):
Working Party on General Safety | Session 115 | 9-12 Oct 2018

40. The expert from the Netherlands presented ECE/TRANS/WP.29/GRSG/2018/11 on new requirements on “CNG compressor” and “CNG accumulator” components used in LNG/CNG systems. The expert from OICA stated that the proposal by the Netherlands result in changes of the level of the technical requirements for vehicles equipped with CNG compressors and/or accumulators. He introduced GRSG-115-19 proposing to submit the new requirements as a new 04 series of amendments to UN Regulation No. 110 together with appropriate transitional provisions.

41. Finally, GRSG adopted ECE/TRANS/WP.29/GRSG/2018/11, as amended below. The secretariat was requested to submit the proposal to WP.29 and AC.1 as draft 04 series of amendments to UN Regulation No. 110 for consideration at their March 2019 sessions.

Insert new paragraphs 24.22. to 24.25. (Transitional provisions), to read:

24.22.As from the official date of entry into force of the 04 series of amendments, no Contracting Party applying this Regulation shall refuse to grant or refuse to accept type approvals under this Regulation as amended by the 04 series of amendments.
24.23.As from 1 September 2022, Contracting Parties applying this Regulation shall not be obliged to accept type approvals to the preceding series of amendments, first issued after 1 September 2022.
24.24.Until 1 September 2024, Contracting Parties applying this Regulation shall accept type approvals to the preceding series of amendments, first issued before 1 September 2022.
24.25.As from 1 September 2024, Contracting Parties applying this Regulation shall not be obliged to accept type approvals issued to the preceding series of amendments to this Regulation.