The waiting list
According to the discussion on the future of this informal working group, the waiting list items are activated.
Item w1 (Approval based on worst case class B50x)(R55-07-19)
Mrs. Domagala presented document R55-10-19 as a proposal for this item. This was elaborated in the document R55-10-20. The French delegates argued that the last sentence of §1.1.1 might not be necessary. Mrs. Domagala was asked to rewrite the justification. (During a coffee break Mrs. Domagala and Mr. Svensson outlined an alternative justification as in R55-10-20. This was not reviewed by the group and Mrs. Domagala shall elaborate to the next meeting
Item w2 (Approval based on worst case class B50x)(R55-07-19)
This matter was dropped.
Item w3 (Alternative performance values)(R55-10-22)
KBA request a more stringent definition of alternative performance values. The base proposal assumed alternative values for a single component. However Mr. Westphäling showed that it is more to this than that. When broaden the scope to a family or range of products this becomes more complex. Mr. Hansen and Mr. Westphäling was assigned the task to outline a new proposal for the broader scope to the next meeting.
Item w7 (Class H50)( )
KBA requests to add a class H50 which seems missing. Considering the reference to the king-pin drawing in annex 5 Mr. Svensson argued that it might be such that the existing class H50-X is not really motivated. I.e. the class H50 –X shall be replaced by the class H50. Mr. Hansen will check this up to the next meeting.
Item w8 (Wedge angle)( R55-09-20)
Mr. Tagliaferri requested the drawing of the wedge in annex 5 §7.8.1. to changed. The changed drawing is shown in document R55-09-20. This was agreed.
Due to lack of time the remaining item were left to be processed later meetings.