BASt:
Double-check whether it is possible to do a case by case assessment for the widening of the test area (see agenda item 5).
TRL:
Check how comments on the benefit assessment can be considered appropriately (see agenda item 5).
Industry:
Report about the design effects and feasibility issues with regard to the small overlap testing requirements in the US IIHS testing (see agenda item 5).
Commission/Industry:
Prepare a first draft for a test procedure based on the discussion in this meeting.