Informal Group on GTR 9-Phase 2
← GTR9 6
GTR9 8 →
3 Jul 2013  · WebEx Teleconference
Agenda All Documents Informal Report
← Agenda Item 4.
5. Review of the status of the drawing package and manual
Agenda Item 6. →
Documentation
GTR9-05-31/Rev.1 FlexPLI version GTR drawing package: revision (zip compressed file)
GTR9-07-04 Information on GTR 9-related drawing packages
GTR9-07-05/Corr.1 FlexPLI: Result of drawing review (surface level)
GTR9-07-06/Corr.1 Result of the FlexPLI manual review
GTR9-07-14 Flex PLI: Detailed Review of Drawing Package and Itemized Check against Master Leg Impactor SN03