Show admin view
Status report of the WLTP Informal Working Group
Document GRPE-69-20
5 June 2014
Download document
Previous Documents, Discussions, and Outcomes
3. (a) | Worldwide harmonized Light vehicles Test Procedure (WLTP)

7. Introducing GRPE-69-20, the Chair of the IWG on WLTP presented the work done since the last GRPE session and recalled the list of open issues that needed to be addressed by the IWG in Phase 1b. He reported that the task force dealing with coasting (sailing) might not be able to provide an acceptable proposal. He announced that the Drafting Coordinator had reported on a number of necessary corrections to UN GTR No. 15, and added that no Corrigendum would be proposed at this stage. The Group preferred to introduce them together with other amendments at the end of Phase 1b. He finally outlined the WLTP Phase 1b road map and announced the forthcoming WLTP IWG meetings scheduled in 2014 and 2015.

8. He concluded by informing GRPE about the next meetings of the group and requested the secretariat to reserve a room for a meeting prior to the January 2015 GRPE session.

9. GRPE acknowledged the status of these activities and agreed with the proposal.

Relates to GTR No. 15 |