1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 |
---|---|---|---|---|---|---|---|---|---|
Document Title | Marking of Camera-Monitor Systems | ||||||||
Reference Number | CMS-02-02/Rev.1 | ||||||||
Date |
23 Jun 2009
|
||||||||
Summary | Discussion paper reviewing the feasibility of marking all components of a CMS system with the ECE-approval mark. | ||||||||
Rulemaking Area(s) | UN R46 Indirect Vision | ||||||||
Meeting(s) | |||||||||
Downloads | |||||||||
UNECE server | .pdf format | ||||||||
Excerpts from session reports related to this document | |||||||||
CMS | Session 2 | 20-21 Apr 2009 |
Several possibilities: HJ: markings are needed to check certification. JK: proposes that for OEM no markings are required (is covered by other docs). There should be a means for identification, not necessarily e-markings. RG: KWA requires at least one approval mark on the central unit. HJ: leave it up to the manufacturer which (main) component is marked. RG: serial no. on the different parts can be used as a means of identification. Approval marking should be on the main part. JK proposes: |
||||||||