Document Number PMP-26-10
1 2 3 4 5 6 7 8 9 10
Document title PMP HD Round Robin - Data received thus far
Date 6 Dec 2011
Source(s) JRC
Status
Rulemaking area(s)
Meeting(s)
Related documents
Downloads: .pdf format
Excerpts from session reports related to this document
PMP | Session 26 | 6 Dec 2011

JRC confirmed that all laboratories had completed testing with, the exception of JRC’s end of round robin testing. JRC had just received the engine for this testing. JRC noted that a number of participating labs had not yet submitted their data. Labs were requested to submit their results, modal data and test reports to JRC (thanasis.mamakos@jrc.ec.europa.eu) as soon as possible, copying to Daimler (hj.stein@daimler.com).