| Document Title | PMP HD Round Robin - Data received thus far | ||||||||
| Reference Number | PMP-26-10 | ||||||||
| Date |
22 Dec 2011
|
||||||||
| Source(s) | JRC | ||||||||
| Rulemaking Area(s) | PMP | ||||||||
| Meeting(s) | |||||||||
| Downloads | |||||||||
| UNECE server | .pdf format | ||||||||
| Excerpts from session reports related to this document | |||||||||
| PMP | Session 26 | 6 Dec 2011 |
JRC confirmed that all laboratories had completed testing with, the exception of JRC’s end of round robin testing. JRC had just received the engine for this testing. JRC noted that a number of participating labs had not yet submitted their data. Labs were requested to submit their results, modal data and test reports to JRC (thanasis.mamakos@jrc.ec.europa.eu) as soon as possible, copying to Daimler (hj.stein@daimler.com). |
||||||||