Document Title | Progress report of the HD Hybrid Emissions (HDH) Informal Group | ||||||||
Reference Number | HDH-07-08 | ||||||||
Date |
5 Dec 2011
|
||||||||
Rulemaking Area(s) | Heavy-duty Hybrids (HDH) | ||||||||
Meeting(s) | |||||||||
Downloads | |||||||||
UNECE server | .pdf format | ||||||||
Excerpts from session reports related to this document | |||||||||
HDH | Session 7 | 12-14 Oct 2011 |
The Chairman announced that a contract had been signed with TNO as a consultant to the Commission instead of TRL, as was previously indicated at the 6th meeting. The work program of TU Graz, which is also covered by this contract, remains unchanged. The Secretary informed that the contract with TU Vienna had been signed, while the contract with Chalmers will be signed in the near future. Nevertheless, the work program at Chalmers has already been started. Also, the total budget of 265 k€ has not been changed. Currently, the work program is slightly behind schedule. The roadmap on page 6 of working paper HDH-07-08 has been modified to reflect this delay. Termination of the research programs is now scheduled as follows:
Timing for WP.29 adoption is not affected, so far. |
||||||||