Task Force on the GTR 9 Legform Bumper Test Area | Session 5 | 30 Jan 2014
Brussels
Agenda Item 7.
Review of action list, if needed

BASt:
Double-check whether it is possible to do a case by case assessment for the widening of the test area (see agenda item 5).

TRL:
Check how comments on the benefit assessment can be considered appropriately (see agenda item 5).

Industry:
Report about the design effects and feasibility issues with regard to the small overlap testing requirements in the US IIHS testing (see agenda item 5).

Commission/Industry:
Prepare a first draft for a test procedure based on the discussion in this meeting.