previous meeting next meeting
Geneva
(Latest 11 June 2014)
Agenda
1. Welcome and organization
2. Adoption of the agenda and approval of previous session minutes
WLTP-07-02/Rev.1 | Revised draft agenda for the 7th WLTP informal working group session
WLTP-06-33/Rev.1 | Minutes of the 6th WLTP informal working group session
3. Open issues table
WLTP-07-03 | Table of WLTP open issues
4. Report from Subgroup EV (Annex 8)
5. Main part & Cycle issues (Annex 1 & 2)
WLTP-07-06 | WLTP open issues: Status report on downscaling/gearshifting Status report prepared by Heinz Stephen.
6. RLD & dyno setting (Annex 4)
WLTP-07-07 | WLTP: Progress report on Annex 4 open issues Progress report on wind tunnel method, on-board anemometry and wind speed, speed points, torque meter method, default road load parameters, warm up procedure, and road load family concept.
WLTP-06-13 | Review of WLTP speed range, speed points, reference speeds for RLD and dyno load setting
WLTP-07-08 | WLTP: Progress report on Annex 4 open issues (updated to 22 May 2014) Progress report on wind tunnel method, on-board anemometry and wind speed, torque meter method, default road load parameters, and road load family concept.
7. Test procedure and conditions (Annex 6)
WLTP-07-10/Rev.1 | WLTP: ACEA starting note on number of tests ACEA background information to support a discussion on the flow and number of tests to be conducted under the WLTP procedures.
WLTP-06-17 | WLTP open issue: Handling of Manual Mode with Automatic Transmission
8. Calculations (Annex 7)
WLTP-07-11 | WLTP open issues: Generic formula for total hydrocarbon density Proposal to add a generic formula for the density of total hydrocarbons to GTR No. 15 as part of phase 1b of its development.
WLTP-07-09/Rev.1 | WLTP-Additional Pollutants subgroup: Status report and open issues
9. Normalization procedures (OIL #48)
WLTP-07-05 | Correction algorithms for WLTP chassis dynamometer and coast-down testing
WLTP-06-31 | WLTP correction algorithms Progress reports from TUG (chassis dynamometer corrections) and TNO (coast down corrections) covering preliminary results (as of 27.03.2014).
10. General issues
WLTP-07-04 | WLTP GTR Version 20.05.2014
11. Next meetings
12. Any other business