GFV-26-04
LNG hold time and venting
Document prepared for GRPE consideration following the approval by GRSG of amendments proposed by the LNG Task Force to introduce provisions for LNG systems into UN Regulation 110 (document GRSG/2013/7). This document concerns LNG holding time and the potential for methane release (i.e., venting from boil-off).
Downloads
UNECE server
Related documents