UN R134: Proposal for a Supplement 2 to the 03 series of amendments
Downloads
UNECE server
Related documents
Proposal to amend para. 2.1. to clarify the definition of appropriate adaptor as a test component specified by the CHSS manufacturer that substitutes for container valve, additional TPRD, and end plug, add a Note explaining container valve and end plug embodiments and supply line connection options, add sentences to paras. 5.1.1., 5.1.2., 5.2., 9.2.1., 9.2.3.2., and Annex 3 para. 2.1. to specify that connections between supply lines for additional TPRDs and appropriate adaptors shall meet requirements and are within the scope of the test, delete “through appropriate adaptors” from Annex 3 para. 5.1., and delete the word “hydraulic” in two instances in para. 9.2.1. to clarify that gas can be used as an option for this test.
Compressed Hydrogen Storage System
Thermally activated pressure relief device