ADS-21-15
ADS guidance and interpretation document: Mitigation risk condition end states

Proposal to remove the placeholder for guidance on expectations concerning mitigation risk condition end states in para. 7.3.1.14. and replace it with text from ADS-20-09 with one paragraph removed based on ADS-20-50. The revised text specifies that while ADS Performance of DDT requirements set out when an MRC is required, they do not specify the process to achieve the MRC or its end state. MRC end states are expected to be fully stopped with parking brake applied and could include activation of hazard lights. The process to reach an MRC is expected to vary depending on the situation and system capabilities, and possible end state examples include stopping in lane, on shoulder, exiting highway, or navigating to nearest parking spot.

UNECE server