ADS-21-10
ADS guidance and interpretation document: Proposal to remove brackets around target operational domain
Downloads
UNECE server
Related documents
Proposal to remove square brackets around “(also known as target operational domain)” in para. 7.3.2.6. The main objective of the paragraph is to compare the ODD with the expected operating conditions, which might not be identical. The proposal removes the square brackets used to clarify another term for expected operating conditions, as expected operating conditions and target operational domain refer to the same thing in different standards currently being updated.
Operational Design Domain: The conditions under which an Automated Driving System feature is designed to operate.